deposition area for surplus fill material (inert soil and subsoil) with a consequential benefit for agricultural activity and all associated site works on a 5.88 hectare site
construction of a construction waste recycling facility (consisting of a materials storage area with integral concrete sump and interceptor materials processing area using existing mobile plant and processed materials storage area), a machinery storage/repair workshop, recessed entrance and access road, well, septic tank and percolation area and associated works. The development includes for ther retention of a new security fence and access gate, concrete area and the use of stored stone in the construction works. The above development will take place within the confines of an existing sand and gravel extraction facility. The revised drawings include for a revision in the site boundaries from those previously submitted. A part of this development also requires a waste management permit in accordance with the 1996 Waste Management Act and te 1998 Waste Management (permit) Regulations. (Revisions from that originally submitted under current planning ref. TA/30404
development will consist of land reclamation with a consequential benefit for an agricultural activity incorporating a proposed wheel wash, the use of existing entrance and existing haul road with a 5m. wide extension to this haul road to be constructed from existing farm track, all further to granted W.M.P. 2005/14.
development will consist of land reclamation with consequential benefit for an agricultural activity incorporating a proposed upgraded wheel wash, the use of existing entrance and upgrade existing haul road with a 5m wide extension to this haul road to be constructed from existing farm track, all further to granted WMP 2005/14
land reclaimation with a consequential benefit for an agricultural activity incorporating a proposed upgraded wheel wash, upgrade of existing haul road with a 5m wide extension to this haul road to be constructed from existing farm track, the use of existing entrance incorporating the removal of a portion of hedgerow at entrance to ensure safety for access and egress and all ancillary site works all further granted W.M.P 2005/14.
No Environment Impact Assesments Associated with this Application