the construction of 150 residential units. A sessional day-care crèche for 45 children (355.9 squares metres) and 4 no. units which comprise of a children’s play centre, an arts & craft centre, a community shop and a gym totalling to 859.7 squares metres. The 150 residential units comprise of 60 no. 3 bed terrace, 72 no. 2 bed apartments, 14 no. 2 bed duplex, 2 no. 3 bed apartments and 2 no. I bed apartments. The day care crèche shall cater for 45 no. children in each of two daily session from 8.45am to 12.15pm and 1.15pm to 4.45pm Monday to Friday inclusive. The development includes the construction of a new site entrance off the Summerhill road to the northern part of the site. The closing of the existing road off the existing Summerhill roundabout to ‘’EMO’’ fuel depot, the construction of a new segment of the relief road for Trim off the existing Summerhill roundabout. The segment of the relief road will have an entrance to the southern part of the site and a new roundabout to the west of the site, off the south of this new roundabout is a new access road to ‘’EMO’’ fuel depot, off the north of new roundabout is an access road of 7 metres in width to an entrance to the northern part of the site, off the west of this new roundabout is the provision for the continuation of the Trim relief road. The application will also include for onsite carparking, foothpaths, site service and all associated site works, the existing buildings on the site are to be demolished and the associated underground storage tanks to be decommissioned. Significant further information/revised plans submitted on this file.
the construction of 150 residential units. A sessional day-care crèche for 45 children (355.9 squares metres) and 4 no. units which comprise of a children’s play centre, an arts & craft centre, a community shop and a gym totalling to 859.7 squares metres. The 150 residential units comprise of 60 no. 3 bed terrace, 72 no. 2 bed apartments, 14 no. 2 bed duplex, 2 no. 3 bed apartments and 2 no. I bed apartments. The day care crèche shall cater for 45 no. children in each of two daily session from 8.45am to 12.15pm and 1.15pm to 4.45pm Monday to Friday inclusive. The development includes the construction of a new site entrance off the Summerhill road to the northern part of the site. The closing of the existing road off the existing Summerhill roundabout to ‘’EMO’’ fuel depot, the construction of a new segment of the relief road for Trim off the existing Summerhill roundabout. The segment of the relief road will have an entrance to the southern part of the site and a new roundabout to the west of the site, off the south of this new roundabout is a new access road to ‘’EMO’’ fuel depot, off the north of new roundabout is an access road of 7 metres in width to an entrance to the northern part of the site, off the west of this new roundabout is the provision for the continuation of the Trim relief road. The application will also include for onsite carparking, foothpaths, site service and all associated site works, the existing buildings on the site are to be demolished and the associated underground storage tanks to be decommissioned. Significant further information/revised plans submitted on this file.
planning permission to demolish existing agricultural sheds, construct proposed private residence and attached granny flat, domestic garage, install proposed wastewater treatment system and percolation area, use existing entrance onto main road to serve proposed works, including all ancillary site works. Significant further information/revised plans submitted on this application
"DIRECT APPLICATION TO AN BORD PLEANALA - SUBMISSION TO AN BORD PLEANALA". The development will consist of the following: • 320 no. dwellings comprising:
o 136 no. houses comprising 10 no. 2-bed, 105 no. 3-bed and 21 no. 4-bed;
o 120 no. apartments within 4 no. 3-5 storey blocks comprising 11 no. studio, 30 no. 1-bed, 71 no. 2-bed and 8 no. 3-bed;
o 64 no. duplex apartments within 8 no. 3-storey blocks comprising 32 no. 2-Bed and 32 no. 3-Bed.
o All units with associated private gardens/ balconies/ terraces to the north/ south/ east/ west elevations.
• A creche and community centre (total floor area c.739 sq.m).
• 563 no. car parking spaces, 188 no. secure/covered bike parking areas and communal bin stores for apartments/duplexes.
• Vehicular and pedestrian accesses from Summerhill Road (R158) with associated upgrades including new cycleways and footpaths.
• All other site works, landscaping, boundary treatments, ESB substation/switchrooms, plant and services provision required to facilitate the development.he application contains a statement setting out how the proposal will be consistent with the objectives of the Meath County Council Development Plan 2013-2019 and Trim Development Plan 2014-2020.
No Environment Impact Assesments Associated with this Application