0922 |
APPLICATION FINALISED |
PERMISSION |
C |
26/01/2009 Monday |
Farrans Construction Ltd. |
Moraghy Quarry Monaghan Road Moraghy |
consist of demolition of quarry shed & erection of (Phase One) residential development of 34 dwellings comprising 18 detached, 12 semi-detached & 4 apartments, 2 & 3 storey in height, associated garages, car ports, access including right turning lane, open space, landscaping & associated site works (this is part of a combined application for a total of 40 dwellings with Castleblayney Town Council) |
2340 |
APPLICATION FINALISED |
PERMISSION |
C |
03/02/2023 Friday |
Flamewood Ltd. |
(Monaghan Rd R183 Site) Moraghy Castleblayney |
permission to construct a new food production facility with a floor area of c.38,356m² on a site extending to c.7.14 hectares. The development includes the following; intake & storage, food prep areas including cooking, packing hall, parking and palletising, dispatch & cold storage, waste management, mezzanine floors, staff access corridors, office accommodation & staff facilities over 4 floors that includes canteen & roof garden, an energy centre building over 3 floors with internal refrigeration & mechanical plant rooms & external plant at roof level & a fully enclosed plant room to house a non-bio WWTS. The facility will vary in height. It includes all internal site roadways, circulation & yard areas including HGVs loading & unloading areas, intake and dispatch yards & trailer parking areas, car & cycle parking, LPG/Biogas refueling area & storage tanks for water, cooking oil, chemicals & gases related to the production activities, construction of underground attenuation drainage system, landscaping & boundary treatments includin fencing, ESB substation 38KV, signage on the building & 4 x totem pole signs fronting on to the R183 Monaghan Rd, 1.2MW solar array at roof level, rainwater harvesting, waste storage area, pump house, site lighting, compressors & roof mounted air handling & communications equipment & antennae including alteration of site levels & stabilisation works including removal of rock and its replacement on site & the construction of retaining structures. The demolition of existing buildings & structures. It will include the repositioning & upgrading of an existing HGV access & a security building an associated traffic control entrance barriers & gates, a new non-HGV vehicular access for staff & visitors onto the R183 with associated access controls & dedicated pedestrian/cycle access. Works on the public road, including the provision of bus stop and lay-by on the south side of the R183 between the two vehicular entrances, alterations to road markings, provision of a footpath, cycle lane & public lighting along the south side of the R183, connecting the existing footpath to the east & other site works. A new foul water sewer & discharge manhole will be constructed along the R183 in an eastward direction connecting to the existing network points east of the application site. An EIAR will accompany this application. Significant Further Information has been submitted |