File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
051207 |
APPLICATION FINALISED |
PERMISSION |
C |
02/11/2005 Wednesday |
BORD NA MONA P.L.C. |
ISLAND DAINGEAN |
TO ERECT A 70 METRE HIGH GUYED METEOROLOGICAL MAST, WITH INSTRUMENTS, FOR WIND MEASUREMENT AT THIS SITE |
061765 |
APPLICATION FINALISED |
PERMISSION |
C |
14/12/2006 Thursday |
SEAMUS MCEVOY |
RIVERLYONS DAINGEAN CO. OFFALY |
CONSTRUCTION OF MANURE PIT AT EXISTING FARMYARD |
09453 |
APPLICATION FINALISED |
PERMISSION |
C |
27/10/2009 Tuesday |
BORD NA MONA ENERGY LTD., |
DRUMCAW OR MOUNTLUCAS, CLONARROW OR RIVERLYONS, BRACKAGH, SCRUB OR PIDGEONPARK, ISLAND, CLONAD, GORTEENKEEL, BALLYNAKILL AND DERRYCRICKET TULLAMORE, |
DEVELOPMENT WHICH WILL CONSIST OF A WIND FARM COMPRISING: THIRTY-TWO TURBINES OF UP TO 100M HUB HEIGHT AND UP TO 112M ROTOR DIAMETER WITH A TOTAL HEIGHT NOT EXCEEDING 156M; A TRANSFORMER AND CRANE HARDSTANDING AREA AT EACH TURBINE; UNDERGROUND ELECTRICAL AND COMMUNICATION CABLES LINKING THE TURBINES; INTERNAL SITE TRACKS; A PERMANENT METEOROLOGICAL LATTICE MAST 100M HIGH; A 110 kV SUBSTATION AND ASSOCIATED EQUIPMENT AND CONTROL BUILDING WITH ASSOCIATED SEPTIC TANK AND TREATMENT SYSTEM; EXTENSION TO AN EXISTING BORROW PIT; DRAINAGE; AND ASSOCIATED WORKS. AN ENVIRONMENTAL IMPACT ASSESSMENT ACCOMPANIES THIS APPLICATION. THE PROPOSED DEVELOPMENT IS ON A SITE THAT IS THE SUBJECT OF AN INTEGRATED POLLUTION CONTROL LICENCE (REG. NO. 503) AS ISSUED BY THE EPA IN ACCORDANCE WITH THE PROVISIONS OF THE ENVIRONMENTAL PROTECTION AGENCY ACT 1992 |
1526 |
APPLICATION FINALISED |
PERMISSION |
C |
09/02/2015 Monday |
MOUNTLUCAS WIND FARM LIMITED |
DRUMCAW OR MOUNTLUCAS TULLAMORE COUNTY OFFALY |
A WIND FARM SERVICE BUILDING INCORPORATING MACHINE SERVICING, WORKSHOP, STORAGE AND STAFF FACILITIES, TOGETHER WITH OFFICES, RECEPTION AREA AND A MULTI-PURPOSE MEETING AND PRESENTATION ROOM. THE DEVELOPMENT WILL ALSO INCLUDE A MARSHALLING YARD, 20 CAR PARK SPACES, 1 COACH PARKING SPACE, BUNDED OIL STORAGE, A ZERO DISCHARGE WILLOW FACILITY FOR FULL EFFLUENT MANAGEMENT, WATER WELL AND PUMPHOUSE, LANDSCAPING AND ASSOCIATED SITE DEVELOPMENT WORKS |
18411 |
APPLICATION FINALISED |
PERMISSION |
C |
27/09/2018 Thursday |
LAOIS AND OFFALY EDUCATION AND TRAINING BOARD |
THE NATIONAL CONSTRUCTION TRAINING CENTRE, DRUMCAW OR MOUNTLUCAS/DERRYCRICKET DAINGEAN, CO. OFFALY, R35 XW10 |
CONSTRUCTION OF A NEW TRAINING BUILDING COMPRISING OF A SINGLE-STOREY TRAINING WORKSHOP AND A TWO STOREY CLASSROOM BLOCK WITH TOILETS AND ANCILLARY ACCOMMODATION WITH ASSOCIATED UPGRADE TO ON-SITE TREATMENT SYSTEM AND SITE DEVELOPMENT WORKS |
22379 |
APPLICATION FINALISED |
PERMISSION |
C |
29/07/2022 Friday |
BORD NA MONA POWERGEN LIMITED |
C.5.14HA SITE WITHIN THE MOUNT LUCAS WIND FARM IN THE TOWNLAND OF DRUMCAW OR MOUNTLUCAS, CO. OFFALY |
A 2MW PILOT SCALE HYDROGEN ELECTROLYSIS PLANT WHICH COMPRISES; AN ELECTROLYSER CONTAINED WITHIN A STANDARD ISO CONTAINER (C. 12.2M IN LENGTH, C. 2.4M IN WIDTH AND C. 3.3M IN HEIGHT), 3 NO. HIGH PRESSURE HYDROGEN STORAGE UNITS, 1 NO HYDROGEN COMPRESSION SYSTEM, 1 NO GENERATOR, 2 NO SUBSTATION/TRANSFORMER STRUCTURES AND A MEDIUM VOLTAGE UNDERGROUND CABLE CONNECTION TO THE NEAREST WIND TURBINE C. 600M TO THE WEST. THE HYDROGEN ELECTROLYSIS PLANT WILL BE SUPPORTED BY THE FOLLOWING INFRASTRUCTURE; HYDROGEN ANALYSER CONTAINER, FIREWALL (MAXIMUM HEIGHT 3.6M), UNDERGROUND FIBRE OPTIC CABLING, 2 NO. 10 CUBIC METRE BUFFER TANKS, GAS CONTROL CABINET, POWER SUPPLY UNIT, 23 CUBIC METRE PRECAST UNDERGROUND WATER STORAGE TANK, WATER FILTRATION SYSTEM, 2 NO BOREHOLE WELLS, AND 4 NO. HGV TRAILER BAYS. ANCILLARY INFRASTRUCTURE WILL INCLUDE 1 NO WELFARE PORTACABIN (C. 24SQM) AND 4 NO. CAR SPACES, PALISADE SECURITY FENCING, VEHICULAR AND PEDESTRIAN ACCESS, A REPLACEMENT FOOTPATH BETWEEN THE SITE ENTRANCE AND THE MAIN ENTRANCE TO THE WIND FARM, SITE DRAINAGE WORKS INCLUDING PETROL INTERCEPTOR AND ALL ASSOCIATED INFRASTRUCTURE AND SITE DEVELOPMENT WORKS. THE APPLICATION IS ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS) |