Planning Application: 22622 (Offaly County Council )
File Number:
22622
Application Type:
PERMISSION
Planning Status:
WITHDRAWN
Received Date:
05/12/2022
Decision Due Date:
Validated Date:
05/12/2022
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
21/12/2022
Extend Date:
Decision Type:
Decision Date:
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
HARMONY SOLAR OFFALY LIMITED
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
A 10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN: WEST PARCEL (DOVEHILL TOWNLAND) C. 119.25 HECTARES, CENTRAL PARCEL (GORTNAMUCK & CURRAGHMORE (EGLISH BY) TOWNLANDS) C. 42.2 HECTARES AND EAST PARCEL (GORTNAMUCK & FREAGH TOWNLANDS) C. 16.07 HECTARES; A ROUTE CORRIDOR OF 3.5 HECTARES FOR AN UNDERGROUND INTERNAL ELECTRICAL CABLE CONNECTING THE WEST AND CENTRAL PARCELS TO THE EAST PARCEL CONSISTING OF C. 3,859M UNDERGROUND CABLING WITHIN THE CORRIDOR OF THE L6042 'RATH ROAD' PUBLIC ROAD. THE TOTAL SITE AREA FOR THE PROPOSED DEVELOPMENT IS C. 181.02 HECTARES AND CONSISTS OF THE FOLLOWING;1,070,756 SQ. METRES OF SOLAR PHOTOVOLTAIC PANELS ON GROUND MOUNTED STEEL FRAMES; INVERTER / TRANSFORMER STATIONS; UNDERGROUND POWER AND COMMUNICATION CABLES AND DUCTS; BOUNDARY SECURITY FENCING; 2 NO. MEDIUM VOLTAGE (MV) CONTROL BUILDINGS; NEW INTERNAL ACCESS TRACKS ASSOCIATED DRAINAGE INFRASTRUCTURE; SITE ENTRANCES TO THE L6042 'RATH ROAD' PUBLIC ROAD; 54 NO. CCTV/ LIGHTING POSTS AND ALL ASSOCIATED SITE SERVICES AND WORKS. INSTALLATIONS OF INTERNAL NETWORK CABLE COMPRISE TRENCHING FOR AN UNDERGROUND MEDIUM VOLTAGE ELECTRICAL CABLE AND ASSOCIATED JOINT BAYS AND INFRASTRUCTURE, FOR A DISTANCE OF APPROXIMATELY 3,859 METRES IN LENGTH ALONG THE L6042 'RATH ROAD' PUBLIC ROAD AND APPROXIMATELY 661.5 METRES WITHIN THE SOLAR FARM LANDS. THE PROPOSED SOLAR FARM WILL BE BROKEN INTO 2 NO. SEPARATE PHASES. 'PHASE 1' WILL CONSIST OF THE DEVELOPMENT OF THE SOLAR PV ARRAYS LOCATED IN THE EAST PARCEL (C. 16.07 HA), CENTRAL PARCEL (C. 42.2 HA) AND THE WEST PARCEL (C. 52.67 HA). 'PHASE 2' OF THE SOLAR FARM WILL CONSIST OF THE DEVELOPMENT OF THE REMAINDER OF THE SOLAR PV ARRAYS IN THE WEST PARCEL COVERING A SITE AREA OF C. 66.58 HA. AS PART OF A SEPARATE STRATEGIC INFRASTRUCTURE DEVELOPMENT (SID) PLANNING APPLICATION, PROVISION OF A 110KV ELECTRICAL SUBSTATION WITH ELECTRICAL CONTROL BUILDING, ASSOCIATED COMPOUND WITH PALISADE FENCE AND 2 NO. OVERHEAD LINE MASTS, WHICH IS TO BE LOCATED IN THE EAST PARCEL, WILL BE LODGED WITH AN BORD PLEANÁLA IN DUE COURSE
Development Address:
THE TOWNLANDS OF DOVEHILL, GORTNAMUCK, CURRAGHMORE (EGLISH BY) AND FREAGH, CO. OFFALY
THE TOWNLANDS OF DOVEHILL, GORTNAMUCK, CURRAGHMORE (EGLISH BY) AND FREAGH CO. OFFALY
10-YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM ON 3 NO. LAND PARCELS AS DESCRIBED HEREIN: WEST PARCEL (DOVEHILL TOWNLAND) C.81.04 HECTARES, CENTRAL PARCEL (GORTNAMUCK & CURRAGHMORE (EGLISH BY) TOWNLANDS) C.42.2 HECTARES AND EAST PARCEL (GORTNAMUCK & FREAGH TOWNLANDS) C.16.07 HECTARES; A ROUTE CORRIDOR OF 3 HECTARES FOR AN UNDERGROUND INTERNAL ELECTRICAL CABLE CONNECTING THE WEST AND CENTRAL PARCELS TO THE EAST PARCEL CONSISTING OF C.3,956M UNDERGROUND CABLING WITHIN THE CORRIDOR OF THE L6042 'RATH ROAD' PUBLIC ROAD. THE TOTAL SITE AREA FOR THE PROPOSED DEVELOPMENT IS C.142.31 HECTARES AND CONSISTS OF THE FOLLOWING; 834,632 SQ. METRES OF SOLAR PHOTOVOLTAIC PANELS ON GROUND MOUNTED STEEL FRAMES; INVERTER/TRANSFORMER STATIONS; UNDERGROUND POWER AND COMMUNICATION CABLES AND DUCTS; BOUNDARY SECURITY FENCING; 2 NO. MEDIUM VOLTAGE (MV) CONTROL BUILDINGS; NEW INTERNAL ACCESS TRACKS ASSOCIATED DRAINAGE INFRASTRUCTURE; 3 NO. SITE ENTRANCES TO THE L6042 'RATH ROAD' PUBLIC ROAD; 40 NO. CCTV/ LIGHTING POSTS AND ALL ASSOCIATED SITE SERVICES AND WORKS. INSTALLATIONS OF INTERNAL NETWORK CABLE COMPRISE TRENCHING FOR AN UNDERGROUND MEDIUM VOLTAGE ELECTRICAL CABLE AND ASSOCIATED JOINT BAYS AND INFRASTRUCTURE, FOR A DISTANCE OF APPROXIMATELY 2,750 METRES IN LENGTH ALONG THE L6042 'RATH ROAD' PUBLIC ROAD AND APPROXIMATELY 1,206 METRES WITHIN THE SOLAR FARM LANDS. THE PROPOSED SOLAR FARM WILL BE BROKEN INTO 2 NO. SEPARATE PHASES. 'PHASE 1' WILL CONSIST OF THE DEVELOPMENT OF THE SOLAR PV ARRAYS LOCATED IN THE EAST PARCEL (C.16.07 HA), CENTRAL PARCEL (C.42.2 HA) AND THE WEST PARCEL (C.14.46 HA). 'PHASE 2' OF THE SOLAR FARM WILL CONSIST OF THE DEVELOPMENT OF THE REMAINDER OF THE SOLAR PV ARRAYS IN THE WEST PARCEL COVERING A SITE AREA OF C.66.58 HA. AS PART OF A SEPARATE STRATEGIC INFRASTRUCTURE DEVELOPMENT (SID) PLANNING APPLICATION, PROVISION OF A 110KV ELECTRICAL SUBSTATION WITH ELECTRICAL CONTROL BUILDING, ASSOCIATED COMPOUND WITH PALISADE FENCE AND 2 NO. OVERHEAD LINE MASTS, WHICH IS TO BE LOCATED IN THE EAST PARCEL, WILL BE LODGED WITH AN BORD PLEANÁLA IN DUE COURSE
Harvest Lodge, Rath Road, Townland of Gortnamuck, Kilcormac, County Offaly
the realignment of the access route to the central land parcel of the solar farm development from Rath Road, granted permission under parent permission (Reg. Ref. 23/74), along with the erection of a new post and rail fence and associated site works.
No Environment Impact Assesments Associated with this Application