File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
18256 |
APPLICATION FINALISED |
PERMISSION |
C |
30/05/2018 Wednesday |
Greener Ideas Limited |
Monksland Athlone Co. Roscommon |
Ten year planning permission for development consisting of the construction of a 100MW gas fired power plant with associated balance of plant, equipment and buildings including an Engine Hall Building with height of 17.20m (comprising 10 no. gas engines; ventilation units, cooling radiator units and 2 no. 27m stacks), an Electrical Annex Building (12.95m height), a 110kV Electrical Substation and Control Building (5.8m height) a Gas AGI including an Instrument House (4.9m height), an Administration Building of 6.1m height, a Workshop/storeroom of 6.45m height, a Tank Farm (consisting of a Diesel Oil Storage Tank (1500m3) , Urea Storage Tank (160m3), Waste Oil Tank (50m3), Pilot Oil Tank (2m3), Lube Oil Storage Tank (16m3), and a Lube Oil Run-Down Tank (16m3) an Engineering Building of 6.45m height, a Raw/Fire Water Storage Tank (1200m3), Treated Water Tank (15m3), Cooling Water Run-Down Tank (12m3), an underground Surface Water Attenuation Tank (348m3) and an underground wastewater holding tank (20m3). The development will also include an access road onto an existing Roscommon County Council owned road with access via the Monksland Industrial Estate; 13 no. car parking spaces; footpath; landscaping, 3m paladin security fence; and all other associated site development works including surface water and foul drainage required to facilitate the development. (The proposed power plant is a project type that requires an Industrial Emissions Licence from the Environmental Protection Agency in accordance with the requirements of the First Schedule to the Environmental Protection Agency Act 1992) at |
22234 |
APPLICATION FINALISED |
PERMISSION |
C |
17/05/2022 Tuesday |
Greener Ideas Ltd |
Monksland Athlone Co. Roscommon |
Permission for development consisting of revisions and alterations of the permitted development of a gas fired power plant under Planning Register Reference PD/18/256. The revisions and alterations relate to the design of the gas fired power plant and will include a change to the electrical output of the power plant to 102MW with associated balance of plant, equipment and buildings including: an engine hall building with a height of 16.9m, (comprising 5 no. gas engines and ancillary infrastructure), an electrical annex building with a height of 18.7m; A workshop building with a height of 5.1m; An administrative building with a height of 6.1m; A tank farm building with a height of 5.7m; A security hut with a height of 3.3m; An exhaust stack with a height of 28.0m; A gas AGI including an instrument kiosk with a height of 4.9m and an analyser kiosk with a height of 2.9m; 2 no. storage containers, each 2.6m in height, radiator coolers with height of 8.5m; Tanks including 2 X diesel oil storage tanks (volume of 1860m3 combined); SCR urea tank (73m3) ; Lube oil storage tank (3m3); Lube oil maintenance tank (26m3); Pilot oil tank (26m3); Fire water storage tank (563m3); Waste oil effluent tank (16m3); Underground surface water attenuation tank (590m3). The revised proposal will involve a revised red line site boundary to provide for drainage and other works within the adjacent roadway. The development optimises the same access permitted under PD/18/256 and includes 12 no. number parking spaces, footpaths, landscaping; fencing and all other associated site development plant and equipment and other works including surface water and foul wastewater drainage, all on site 1.8 hectares in size (A Natura Impact Statement(NIS) is submitted as part of the planning application) ( Permission is sought for a period of 10 years) at |
2460393 |
APPLICATION FINALISED |
PERMISSION |
C |
21/08/2024 Wednesday |
Greener Ideas Limited, C/o Tom Lawlor |
Monksland Athlone County Roscommon |
Permission for development consisting of amendments to development granted under Register Reference PD/18/256 for a gas fired power plant in Monksland, Athlone, Co. Roscommon and subsequently amended by Reg. Ref. PD/22/234. Permission is sought for revisions to the layout of the Above Ground Infrastructure (AGI), associated with Gas Network’s Ireland’s high-pressure gas supply to the power plant. The revisions include a new revised AGI site entrance with access gate, amendments to the internal road network, amendments to the security fencing, a new pedestrian entrance/exit, a revised and new emergency exit, repositioning of the existing pig trap, repositioning of site security fencing, the addition of a temporary pig trap base, removable bollards, an electrical metering cabinet, an ESB electrical pole, an Electrical & Instrumentation kiosk, a regulators/metering kiosk, packaged boiler unit kiosk and a gas analyser kiosk. No changes are proposed to the permitted onsite drainage. The development permitted under Reg. Ref. PD/18/256 includes activities which will be subject to an Industrial Emissions Licence. An updated Natura Impact Statement (NIS) has been prepared for this development and is submitted as part of the planning application at |