Planning Application: 1163 (Roscommon County Council )
File Number:
1163
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
18/02/2011
Decision Due Date:
14/04/2011
Validated Date:
18/02/2011
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
14/04/2011
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
24/03/2011
Applicant Details
Applicant name:
Electricity Supply Board,
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
for development at ESB Athlone 110kV electrical transformer station. The development will consist of alterations to the existing 110kV station to include; the installation of a new bunded 110kV arc suppression coil, a new 110kv changeover disconnect switch; associated site works at
for development at ESB Athlone 110kV electrical transformer station. The development will consist of alterations to the existing 110kV station to include; the installation of a new bunded 110kV arc suppression coil, a new 110kv changeover disconnect switch; associated site works at
To install voltage compensation equipment in Athlone 110kv subsation, which will include extending the existing 110kv busbar, extending the compound fence and installing a detuned capacitor bank within the station compound in the townland of
for the development will consist of alterations to the existing 110kv electrical transformer station to include the replacement of two existing 110KV/MV transfomers, four new 110KV cable termination structures, the installation of a new MV container, a new arc suppresion coil with oil tight bunding, new oil tight bunding around three transformers, change over switch, instrument transformers, surge arresters, cable sealing ends and assoicated steel supports also, site development works consisting of foundations for ESB Electrical Transformer Station, at
Alterations to the existing 110 kV electrical transformer station which will comprise of the replacement of the high voltage equipment associated with the 110kV busbar and the installation of a new 110kV cable bay. All development works will be contained within the existing site boundaries at Athlone 110kV substation at