Permission to: (i) Demolish existing rear extension and sheds; (ii) Extend and renovate existing dwelling house; (iii) Upgrade existing waste water treatment system and secondary treatment area to current EPA standards and all other ancillary site works at
Permission for development consisting of amendments to extant planning permission ABP-307726-20 and will provide for: 1. Erection of two Enercon E138 turbine models in lieu of the Vensys 121 turbine models agreed with the Planning Authority, under condition 4 (a) of planning permission ABP-307726-20; Turbine T1 will have a hub height of 95.53m, a blade diameter of 138m and a blade tip height of 164.65m; Turbine T2 will have a hub height of 81m and a blade diameter of 138m and a blade tip height of 150m. The combined output from the turbines will be 4.9MW; 2. Relocation of the access road serving the development; 3. The relocation of under-ground electrical cabling to the relocated access road and additional underground electrical cabling; 4. Increase in the hub height of turbine T1 to 95.53m, increasing the blade tip height from 150m to 164.65 m and micro-siting of turbine T1 by 12.75m. 5. Increased area of the hardstands associated with each turbine; 6. Amended substation structure to incorporate a proposed modular windfarm control room and switch room and an ESB modular MV station; 7. Inclusion of a battery storage unit and a transformer unit; 8. Revised site boundaries at
No Environment Impact Assesments Associated with this Application