Planning Application: 2272 (Roscommon County Council )
File Number:
2272
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
14/02/2022
Decision Due Date:
23/05/2022
Validated Date:
14/02/2022
Invalidated Date:
Further Info Requested:
07/04/2022
Further Info Received:
26/04/2022
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
23/05/2022
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Colum Mullally & Niamh Sweeney,
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
Permission to construct a four bedroom dwelling and a detached garage, the application will also include an effluent treatment unit, percolation area, new entrance and all associated site works and drainage at
Permission to construct a four bedroom dwelling and a detached garage, the application will also include an effluent treatment unit, percolation area, new entrance and all associated site works and drainage at
Permission for: (A) amendments to (i) extant planning permission PD/18/313, which amended planning application PD/11/126, (ii) extant planning permission ABP-303677-19, which amended planning permissions PD/11/126 and PD/18/313 and (iii) extant planning permission ABP-307726-20, which amended planning permission PD/18/313; (B) Permission for the development of a battery storage unit and a transformer unit. The amendments in (A) above will provide for : 1. Erection of two Enercon E138 turbine models in lieu of the Vensys 121 turbine models agreed with the Planning Authority, under condition 4(a) of planning permission ABP-3037726-19. Turbine T1 will have a hub height of 95.53m, a blade diameter of 138m and a blade tip height of 164.65m. Turbine T2 will have a hub height of 81m and blade diameter of 138m and a blade tip height of 150m. The combined output from the turbines will be 4.9MW; 2. Relocation of the access road serving the development, as previously permitted under planning permissions PD/11/126, PD/18/313, ABP-303677-19 and ABP-307726-20; 3. The relocation of underground electrical cabling to the relocated access road referred to under paragraph 2 above and additional underground electrical cabling to serve the proposed modular windfarm control and switch rooms, the ESB modular MV station, referred to in paragraph 6 below and the new battery storage and transformer units referred to in (B) above; 4. Increase in the hub height of turbine T1 to 95.53m, increasing the blade tip height from 150m to 164.65m and micro-siting of turbine T1 by 12.75m; 5. Increase in the area of the hardstands associated with each turbine; 6. Amended substation structure to incorporate a proposed modular windfarm control and switch rooms and an ESB modular MV station; 7. Revised site boundaries at
No Environment Impact Assesments Associated with this Application