construction of two panel antennae. The development to which this application for planning permission relates involves the construction of two 1.9m high panel antennae concealed within dummy vents, 2.2m high and 0.6m wide, both sited on a plant room 2.7m wide and 61.7m in length which will contain 2 no. Vodafone RBS units each 0.6m wide, 0.4m in depth and 1.85m high and the erection of a radio dish of 0.6m in diameter in the plant room wall recess. The development will take place on the roof top of the Multi Storey Block, covering an area of approx 0.0793 ha and includes all associated site works.
Development Address:
Sligo General Hospital, Sligo
Architect Name:
Declan Brassil & Co Limited
Location Key:
SLIGO GENERAL HOSPITAL
Electoral Division:
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
12/10/2005
Manager Order:
361/05
Decision Type:
Conditional
Number of Conditions:
3
Grant Date:
14/11/2005
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
13/11/2010
Decision Description:
construction of two panel antennae. The development to which this application for planning permission relates involves the construction of two 1.9m high panel antennae concealed within dummy vents, 2.2m high and 0.6m wide, both sited on a plant room 2.7m wide and 61.7m in length which will contain 2 no. Vodafone RBS units each 0.6m wide, 0.4m in depth and 1.85m high and the erection of a radio dish of 0.6m in diameter in the plant room wall recess. The development will take place on the roof top of the Multi Storey Block, covering an area of approx 0.0793 ha and includes all associated site works.
PP - for development consisting of the construction of a single storey extension, 27 sqm, to the existing CSSD department, replacement of existing windows to powder coasted aluminium glazing on the south elevation, provision of a single story temporary CSSD unit for use during construction, 190 sqm, ancillary site works and all associated ground works. The new building is within the curtilage of a protected structure at Sligo University Hospital
PP - for development consisting of the construction of a single storey extension, 27sqm, to the existing CSSD department, replacement of existing windows to powder coated aluminium glazing on the south elevation, provision of a single story temporary CSSD unit for use during construction, 190 sqm, ancillary site works and all associated ground works. the new building is within the curtilage of a protected structure
No Environment Impact Assesments Associated with this Application