or construction works to facilitate future hospital development at Sligo General Hospital, Rathquarter, Sligo. consisting of (a) bulk dig to reduce levels , new internal road and surface car parking , associate surface waher drainage, landscaping & public lighting , demolition of one permanent & 3 semi permanentbuildings, relocation odf bulk oxygen storage tank, decommissioning & removal of existing helipad facility, provision of temporary construction access onto Ash Laneall at Sligo General Hospotal, The Mall, Rathquarter, sligo. (b). Disposal of surplusexcavated material arising from construction works as described in (a) to Nort Western Health Board lands at
1. To erect an extension to the south elevation of the multi-storey block with a floor area of 174.58 sq.m, at level 2. (Ground Level). 2. To erect an extension to the North Elevation of the multi storey block with a floor area of 145.05 sq.m at Levels 3 and 4, (Ground and first floor level) plus ancillary site works at
No Environment Impact Assesments Associated with this Application