File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
07502 |
APPLICATION FINALISED |
PERMISSION |
C |
16/05/2007 Wednesday |
Hillstreet Quarries Ltd. |
Glen, Knockroe, Derrysallagh & Rover Geevagh, Co. Sligo |
continued operation of existing quarry within an overall site of 287 hectares, this application is accompanied by an Environmental Impact Statement.
|
13357 |
APPLICATION FINALISED |
PERMISSION |
U |
19/12/2013 Thursday |
Kilronan Windfarm Ltd |
Glen, Knockroe, Derrysallagh & Rover Townlands Co. Sligo |
proposed amendment to planning Condition No. 28(a) of planning reference PL 12/133 (Derrysallagh Wind Farm) which relates to the noise limits applied to the permitted windfarm in the townlands of Glen, Knockroe, Derrysallagh and Rover, Co. Sligo. It is proposed to modify the unit of measurement of noise during operation of the windfarm from dB(A) Leq, 5min to dB(A) L90, 10min in line with the Environmental Impact Assessment for the Derrysallagh Wind Farm |
1864 |
APPLICATION FINALISED |
PERMISSION |
R |
07/03/2018 Wednesday |
Derrysallagh Wind Farm Ltd |
Carrowcashel, Tullynure, Glen, Straduff and Ballynashee Sligo |
for development consisting of laying an underground 38kV electricity cable and associated ducting and ancillary development primarily within the public road to facilitate the connection of the permitted Derrysallagh Wind Farm with the townlands of Derrysallagh and Glen, Co. Sligo (Planning Ref: PL 12/133) to the National electricity grid via the existing Garvagh 110kV substation in the townland of Seltan, County Leitrim. Part of the development is in place and subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP - 300811-18). The proposed development within the jurisdiction of Sligo County Council for which Permission is sought include the following: Installation of approx 0.69km of underground cable ducting, 2 no. joint bays and ancillary development laid primarily within the public road corridor with a section of ducting to be installed within a steel box structure to be fixed to Boleymaguire Bridge within the townlands of Carrowcashel, Co. Sligo and Boleymaguire, Co. Leitrim. Within the townlands of Tullynure and Carrowcashel, permission is sought for the carrying out of remedial works to approx 1.28 km of the installed underground cable ducting which is subject to a pending application for Substitute Consent to An Bord Pleanala (Ref: ABP - 300811-18). Remedial works include the relaying of backfill material. Permission is also sought for the installation of the electricity cable following completion of the civil works
|
20178 |
APPLICATION FINALISED |
RETENTION |
C |
10/06/2020 Wednesday |
Derrysallagh Windfarm Ltd |
Knockroe (Ballynashee ED), Co. Sligo |
development consisting of (i) retention of a meteorological mast, with an overall height of 31 metres, supported by guy wires for the purpose of measuring and recording meterological data, (ii) concrete mast foundation and anchors; (iii) approximately 40m of underground electricity and telecommunications cabling; and (iv) all associated site development and reinstatement works |
20234 |
APPLICATION FINALISED |
RETENTION |
C |
20/07/2020 Monday |
Derrysallagh Windfarm Ltd |
Townlands of Glen, Knockroe, Derrysallagh and Rover, (E.D. Ballynashee), Co Sligo |
for development consisting of retention of infrastructure. The elements are to be retained for the lifetime of the wind farm. The development consists of blade delivery trestles constructed at the turbine crane hardstands required for the set down and storage of turbine blades at each location, passing bays required for vehicles to pass each other on-site and upgrade and use of 154m of pre-existing tract between Turbines T9 and T10. The retention of these structures is required for continued maintenance of turbines on site.
|
2120 |
APPLICATION FINALISED |
PERMISSION |
C |
01/02/2021 Monday |
Derrysallagh Windfarm Limited |
Glen (E.D. Ballynashee) Co Sligo |
Development of infrastructure at Derrysallagh Wind Farm consisting of installation of a Storage Container and Site Office/Canteen Portacabin on a gravel area with concrete access paths and associated site works, adjacent to existing Substation and Compound.
|