development consisting of: (1) construction of a 285 sq.m single storey building containing; clinic rooms, individual and group offices, a group education room, adult and paediatric waiting areas, staff areas and ancillary spaces (2) construction of a 12 sqm single storey outbuilding containing; tank room, boiler room, and waste store (3) external works comprising the enlargement of the existing Orthodontic Department car park to accommodate 26 car parking spaces, together with associated site development works, works to site boundaries, street lighting, services and signage
Development Address:
Sligo University Hospital, The Mall, Sligo
Architect Name:
Gavin Phelan
Location Key:
THE MALL
Electoral Division:
Planner:
05
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Commencement Notice validated on Building Control Management System (B.C.M.S.).(Ref.:CN0057406SO).
Decision
Decision Date:
13/12/2016
Manager Order:
P555/16
Decision Type:
Conditional
Number of Conditions:
6
Grant Date:
13/01/2017
Grant Managers Order #:
P555/16
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
12/01/2022
Decision Description:
development consisting of: (1) construction of a 285 sq.m single storey building containing; clinic rooms, individual and group offices, a group education room, adult and paediatric waiting areas, staff areas and ancillary spaces (2) construction of a 12 sqm single storey outbuilding containing; tank room, boiler room, and waste store (3) external works comprising the enlargement of the existing Orthodontic Department car park to accommodate 26 car parking spaces, together with associated site development works, works to site boundaries, street lighting, services and signage
1. To erect an extension to the south elevation of the multi-storey block with a floor area of 174.58 sq.m, at level 2. (Ground Level). 2. To erect an extension to the North Elevation of the multi storey block with a floor area of 145.05 sq.m at Levels 3 and 4, (Ground and first floor level) plus ancillary site works at
for the construction of a 746m2 development at level 7 & 8 of the multi-storey block over the existing level 6 research & education library at Sligo Regional Hospital. The development shall comprise (1) a medical education and training centre including links to the main hospital circulation core at level 7 & 8 and associated air handling plant at roof level, (2) the removal from site of the existing temporary buildings which currently houses the education & training centre located adjacent to the Connaughton Road access. The development shall also comprise site development works, site signage and connections to existing site services infrastructure
Development consisting of a new gas compound and demolition of brick chimney with associated works (consisting of new 100m2 concrete base with perimeter fencing and retaining wall for 1 no lpg tank, new gas pipe to fill point at proposed layby with protective fencing, new footpath to access existing staff car park, new layby to existing high access road with associated new steps from proposed layby down to proposed tank base level, new boiler house of 4.0m2 area and 2.9m height with associated ductwork and demolition of existing 18.1m high brick chimney at existing boiler house)
No Environment Impact Assesments Associated with this Application