development consisting of the demolition of an existing external waste water compound with an area of 43.35m2, a proposed waste compound with an area of 45.92m2, and a bicycle shelter with an area of 49.68m2, to construct a new 1-storey extension on the North elevation of the main building, consisting of gross ground floor manufacturing area of 208.00m2
Development Address:
Finisklin Business Park, Finisklin, Sligo
Architect Name:
Fergus Muldoon
Location Key:
FINISKLIN
Electoral Division:
Planner:
06
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Commencement Notice validated on Building Control Management System (B.C.M.S.)(Ref.:CN0080609SO).
Decision
Decision Date:
06/05/2021
Manager Order:
P194/21
Decision Type:
Conditional
Number of Conditions:
7
Grant Date:
15/06/2021
Grant Managers Order #:
P194/21
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
14/06/2026
Decision Description:
development consisting of the demolition of an existing external waste water compound with an area of 43.35m2, a proposed waste compound with an area of 45.92m2, and a bicycle shelter with an area of 49.68m2, to construct a new 1-storey extension on the North elevation of the main building, consisting of gross ground floor manufacturing area of 208.00m2
Planning permission at advance factory No. 2 Finisklin Industrial Estate for Abbott sign and logo, non illumunated stainless steel letters and fixed to office building cladding at high level.
development consisting of the proposed building extension comprising of an additional 267.08m2 of manufacturing space, the demolition of an existing substation and construction of a new relocated substation with an area of 22.49m2 including all other associated site ancillary works
Development consisting of the construction of a new Waste holding facility comprising of the construction of 2No 50,000l liquid storage tanks, 390sqm of hard standing and a new internal access route including all other associated site ancillary works and landscaping
development consisting of a proposed two storey office building (gross floor area of 1774.4 m2), adjacent bike shelter (10.5 m2) and a car park comprising 224 parking spaces and all other associated site ancillary and infrastructure works including carpark lighting