20259 |
APPLICATION FINALISED |
PERMISSION |
C |
16/03/2020 Monday |
Rejjy Property Holdings Ltd. |
Nenagh North and Nenagh South Dublin Road Nenagh, Co. Tipperary |
material change of use of 14 existing three-storey holiday homes to private dwellings, the construction of new metal railings to enclose front gardens, hard and soft landscaping, external lighting and associated site works, adjacent to Abbey Court Hotel |
201262 |
APPLICATION FINALISED |
PERMISSION |
C |
29/10/2020 Thursday |
Rejjy Property Holdings Ltd. |
Tyone adjacent to the Abbey Court Hotel Dublin Road Nenagh, Co. Tipperary |
the division and alteration of two existing three-storey houses to form two no. two-bedroom apartments at ground floor level and two no. duplex three-bedroom units at first and second floor levels, (four units in total) including access stairs from the ground floor, proposed alterations of rear elevations to include forming new door openings and closing other existing opes, proposed subdivision of existing rear gardens, proposed access road and car-parking spaces, new boundary walls with gates, hard and soft landscaping, external lighting and associated site works |
201308 |
APPLICATION FINALISED |
PERMISSION |
C |
06/11/2020 Friday |
Rejjy Property Holdings Ltd. |
Tyone, adjacent to the Abbey Court Hotel Dublin Road Nenagh, Co. Tipperary |
material change of use of 10 existing three-storey holiday homes to private dwellings, including the construction of new metal railings to enclose front gardens, new bin stores, external landscaping, external lighting and associated site works |
21108 |
INCOMPLETED APPLICATION |
PERMISSION |
|
02/02/2021 Tuesday |
Rejjy Property Holdings Ltd. |
Tyone Dublin Road Nenagh, Co. Tipperary |
solar panels to roof of rear elevations of 14 existing private dwellings and all associated site works |
24152 |
APPLICATION FINALISED |
EXTENTION OF DURATION |
R |
08/07/2024 Monday |
|
Castleway Dublin Road Nenagh |
the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works |
24267 |
APPLICATION FINALISED |
EXTENTION OF DURATION |
U |
20/11/2024 Wednesday |
|
Castleway Dublin Road Nenagh |
the construction of 16 semi-detached, three-bedroom, 2-storey houses and 8 three-bedroom, two-storey terraced houses, 8 two-bedroom apartments over four storeys, new entrance gates and access road to existing holiday homes and associated site works |