Planning Application: 15600032 (Tipperary County Council )
File Number:
15600032
Application Type:
PERMISSION FOR RETENTION
Planning Status:
APPLICATION FINALISED
Received Date:
26/01/2015
Decision Due Date:
20/01/2016
Validated Date:
27/01/2015
Invalidated Date:
Further Info Requested:
19/03/2015
Further Info Received:
15/12/2015
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
19/01/2016
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
06/01/2016
Applicant Details
Applicant name:
Clonmel Waste Disposal
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
at their existing Materials Recovery Facility A) a concrete loading ramp with netted screen and galvanised sheeted fence. B) The enlargement of 2 no. waste handling buildings comprising of an increase in floor area and an increase in building height. C) A new external steel maintenance staircase to southern side of waste intake/store building. D) Installation of 12,000 litre effluent storage tank. E) An on-site sanitary facility for staff use. F) site works including alterations to underground foul, storm & effluent sewers, extension to stoned yard areas and construction of stoned yard for staff car parking
Development Address:
Lawlesstown, Clonmel, Co Tipperary
Architect Name:
Bryan McCarthy & Associates
Location Key:
LAWLESSTOWN PART OF
Electoral Division:
Planner:
Jonathan Flood
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
3 month time extension 18/12/2015
Decision
Decision Date:
19/01/2016
Manager Order:
Decision Type:
Conditional
Number of Conditions:
7
Grant Date:
23/02/2016
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
22/02/2021
Decision Description:
at their existing Materials Recovery Facility A) a concrete loading ramp with netted screen and galvanised sheeted fence. B) The enlargement of 2 no. waste handling buildings comprising of an increase in floor area and an increase in building height. C) A new external steel maintenance staircase to southern side of waste intake/store building. D) Installation of 12,000 litre effluent storage tank. E) An on-site sanitary facility for staff use. F) site works including alterations to underground foul, storm & effluent sewers, extension to stoned yard areas and construction of stoned yard for staff car parking
(a) An extension to the existing waste intake shed including backlit signage, (b) A new higher roof to existing waste intake shed, (c) An open fronted shed over the WEEE area, (d) An open fronted shed to the wood picking area, (e) New concrete storage bays, (f) New 2 storey weighbridge building and weighbridge, (g) New single storey prefabricated clock in and staff locker building, (h) 2 new vehicular entrances including re-aligned hedgerows and widened roadways, (i) New staff carparking and paladin fence surround, (j) New elevated walkway, (k)Relocation of existing fuel storage tank on site, (l) Expansion of concrete yards, (m) New packaged waste water treatment system and percolation area on site, (n) New metal sheeted fence and gate, (o) New 9m high post and mesh windbreak to rear of wood-picking area AND FOR PERMISSION FOR THE INDEFINITE RETENTION OF
(p) Concrete storage bays, (q) A single storey prefabricated staff welfare facility consisting of toilets, showers, canteen and meeting room
No Environment Impact Assesments Associated with this Application