03510990 |
APPLICATION FINALISED |
PERMISSION FOR RETENTION |
C |
17/09/2003 Wednesday |
Kevin and Paul Ryan |
Monakeeba Mill Road Thurles |
Retention of building measuring 450 sq. m. and for its use for fuel storage and baling and storage of pre-segregated cardboard, retention of gas storage compound measuring 118 sq. m., hardstanding area measuring 7,527 sq. m. and concrete loading area measuring 191 sq. m., retention of connection to permitted septic tank and percolation area, and permission for storage of new bins for distribution to households, 4 no. skips for storage of glass collected by applicant, parking for 2 no. fuel lorries, 2 no. oil lorries and 4 no. waste collection lorries and all associated site development works |
05510363 |
INCOMPLETED APPLICATION |
PERMISSION FOR RETENTION |
|
05/04/2005 Tuesday |
Kevin & Noreen Ryan |
Monakeeba Mill Road Thurles |
Modifications to a fuel and storage shed permitted under Register Ref. PLC/16267. The modifications to be retained include an additional floor area of 180 sq. m. ancillary office (21.7 sq. m.) and toilet facility, gas storage compound to the west (rear) of building, and retention of a connection to an existing septic tank, and associated development and works |
05510422 |
WITHDRAWN |
PERMISSION FOR RETENTION |
|
19/04/2005 Tuesday |
Kevin & Noreen Ryan |
Monakeeba Mill Road Thurles |
Modified fuel & storage shed under Ref: PLC/16267. Modifications include additional floor area of 145sqm, ancillary office (21.7sqm) and toilet facility, gas storage compound to west (rear) of building, and retention of a connection to an existing septic tank |
06510829 |
APPLICATION FINALISED |
PERMISSION |
C |
23/06/2006 Friday |
Kevin & Noreen Ryan |
Monakeeba Mill Rd Thurles |
to retain fuel & storage shed (original permission PLC/16267) and a waste oil collection tank; modifications to the fuel and storage shed to include additional floor area of 145 sqm, ancillary office 21.7 sqm and a toilet facility. Permission is sought for connection to the existing county council foul rising main to the front of the site and for a gas storage compound to west (rear) of the existing building |
10510108 |
APPLICATION FINALISED |
PERMISSION |
R |
19/03/2010 Friday |
Ryan Brothers Environmental Services |
Monakeeba Mill Road Thurles |
new waste recovery/recycling facility building, plus an on site package sewage treatment plant, polishing filter & pipe work to cater for the existing & proposed developments, plus associated works which would include a surface water collection system with rainwater harvesting, oil & silt interceptor & attenuation measures, de-commissioning of existing septic tank & percolation area, car parking, noise attenuation barriers, security & stock proof fencing & gates, kerbing & paving, alterations to site entrance, together with a partial change of use of existing building office & office wc (31.1m2 approximately) to shared use as office & office wc between the existing & proposed developments. The waste recovery/recycling facility building would take in dry recyclables & skip hire materials & would also include an enclosed parking & refuelling area for a waste collection truck fleet. The building would have a gross floor area of 1,099.62 m2 approximately & would be 10.50m in height. A waste facility permit would be required in relation to the development |
11510450 |
APPLICATION FINALISED |
PERMISSION |
C |
22/12/2011 Thursday |
Ryan Brothers Environmental Services |
Monakeeba Mill Road Thurles |
new waste recovery/recycling facility building, plus an on site package sewage treatment plant, polishing filter & pipe work to cater for the existing & proposed developments, plus associated works which would include a surface water collection system with rainwater harvesting, oil & silt interceptor & attenuation measures, de-commissioning of existing septic tank & percolation area, car parking, noise attenuation barriers, security & stock proof fencing & gates, kerbing & paving, alterations to site entrance, together with a partial change of use of existing building office & office w.c. (31.1m2 approximately) to shared use as office & office w.c. between the existing & proposed developments. The waste recovery/recycling facility building would take in dry recyclables & skip hire materials & would also include an enclosed parking & refuelling area for a waste collection truck fleet. The building would have a gross floor area of 1,099.62 m2 approximately & would be 10.50m in height. A waste facility permit would be required in relation to the development |