Planning Application: 17600372 (Tipperary County Council )
File Number:
17600372
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
11/04/2017
Decision Due Date:
03/01/2018
Validated Date:
11/04/2017
Invalidated Date:
Further Info Requested:
02/06/2017
Further Info Received:
31/10/2017
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
19/12/2017
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
04/12/2017
Applicant Details
Applicant name:
Miltown Composting Systems Ltd
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
an increased throughput of organic waste material at the existing Miltown Composting Ltd. facility. The proposed planning consists of an increased throughput which will also require a review of the facility's EPA Waste Licence (Reg. No. W0270-01). The application shall be accompanied by an Environmental Impact Statement
Development Address:
Miltownmore, Fethard, Co. Tipperary
Architect Name:
Location Key:
MILTOWNMORE
Electoral Division:
Planner:
Jonathan Flood
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
Yes
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
19/12/2017
Manager Order:
Decision Type:
Conditional
Number of Conditions:
2
Grant Date:
31/01/2018
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
30/01/2023
Decision Description:
an increased throughput of organic waste material at the existing Miltown Composting Ltd. facility. The proposed planning consists of an increased throughput which will also require a review of the facility's EPA Waste Licence (Reg. No. W0270-01). The application shall be accompanied by an Environmental Impact Statement
an increased throughput of organic waste material at the existing Miltown composting facility. The proposed planning consists of an increased throughput which will also require a review of the facility's EPA Waste Licence (Reg. No. W0270-01). The application shall be accompanied by an Environmental Impact Statement
reconstruction and extension of existing agricultural storage structure including use as organic material maturation and extension to existing storage facility. Increase in allowed intake of organic material from 50,000 to 75,000 tonnes per annum to the processing facility. Air handling bio-filter installation and associated extract and input fans. All necessary site works. An Environmental Impact Assessment (EIAR) will be submitted with the application to Tipperary Co. Co. with the planning application and the development will require a review of the site’s EPA Industrial Emissions License (W0270-02)
to construct a 36-meter- high multi use lattice tower telecommunications structure with headframe carrying antenna and dishes enclosed with a 2.4 meter high palisade fence compound with associated ground equipment and associated site works including new access track
reconstruction and extension of existing agricultural storage structure including use as organic material maturation and extension to existing storage facility, increase in allowed intake of organic material from 50,000 to 75,000 tonnes per annum to the processing facility, air handling bio-filter installation and associated extract and input fans, all necessary site works, an Environmental Impact Assessment (EIAR) will be submitted with the application to Tipperary Co. Co. with the planning application and the proposed development will require a review of the site’s EPA Industrial Emissions Licence (W0270-02)