Planning application details ref: 21407 Tipperary County Council

100%100% Complete (warning)

Planning Application: 21407 (Tipperary County Council )
File Number: 21407
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 30/03/2021 Decision Due Date: 05/08/2021
Validated Date: 30/03/2021 Invalidated Date:
Further Info Requested: 21/05/2021 Further Info Received: 11/06/2021
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 04/08/2021
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By:

Applicant Details

Applicant name: MSD Ireland (Ballydine)
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: construction of a proposed three-storey pilot plant manufacturing facility sized approximately 3,266 square metres and approximately 20.75 metres high and located and linked to the existing factory 03 manufacturing building and located south of the O.S.D. manufacturing facility, currently under construction (ref. 20/693). The project development alos includes the following: a) An equipment yard housing plant, equipment and abatement system, vents and equipment housings including a covered waste tank, b) Roof mounted equipment and vents, c) Modifications to existing underground utilities including a surface water attenuation tank, underground storage tanks and miscellaneous works, d) The extension of the temporary contractors’ compound, currently under construction and additional local temporary contractor parking together with a second compound directly adjacent to the proposed facility, e) Revised landscaping and site-works, f) Modifications to the existing internal roads layouts, site lighting, pipe bridges, links, bunded tanks and supporting structures, and a truck staging area, g) Modifications to the existing car park layout to allow for the inclusion of additional accessible car parking spaces and electrical charge points, h) Alterations to the elevations of Factory 03 to accommodate the proposed development. This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act 2003) is required. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) accompany this planning application. This is a site to which the Chemicals Act (Control of Major Accident Hazards involving dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies
Development Address: Ballydine, Kilsheelan, Clonmel, Co. Tipperary
Architect Name: Location Key: BALLYDINE
Electoral Division: Planner: Jonathan Flood
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: Yes Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 04/08/2021 Manager Order:
Decision Type: Conditional Number of Conditions: 9
Grant Date: 05/09/2021 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 04/09/2026
Decision Description: construction of a proposed three-storey pilot plant manufacturing facility sized approximately 3,266 square metres and approximately 20.75 metres high and located and linked to the existing factory 03 manufacturing building and located south of the O.S.D. manufacturing facility, currently under construction (ref. 20/693). The project development alos includes the following: a) An equipment yard housing plant, equipment and abatement system, vents and equipment housings including a covered waste tank, b) Roof mounted equipment and vents, c) Modifications to existing underground utilities including a surface water attenuation tank, underground storage tanks and miscellaneous works, d) The extension of the temporary contractors’ compound, currently under construction and additional local temporary contractor parking together with a second compound directly adjacent to the proposed facility, e) Revised landscaping and site-works, f) Modifications to the existing internal roads layouts, site lighting, pipe bridges, links, bunded tanks and supporting structures, and a truck staging area, g) Modifications to the existing car park layout to allow for the inclusion of additional accessible car parking spaces and electrical charge points, h) Alterations to the elevations of Factory 03 to accommodate the proposed development. This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act 2003) is required. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) accompany this planning application. This is a site to which the Chemicals Act (Control of Major Accident Hazards involving dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: