File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
04511649 |
APPLICATION FINALISED |
PERMISSION |
C |
01/11/2004 Monday |
Sustainable Projects Ireland Ltd. |
Oxpark and Townfields Cloughjordan |
The creation of a sustainable community. The development will comprise of demolition of the former Lime Tree pub and outbuildings on Main Street and the installation of site infrastructure for 133 mixed residential units and the site services for other associated buildings totalling 1250 q. m., with access from the Main Street and from the Step Road, including roads, public lighting, foul sewer, storm sewer, urine sewer and storage tanks, sludge drying facility and waste water treatment facilities requiring a waste management permit and a license for discharge of sewage effluent |
04511650 |
APPLICATION FINALISED |
OUTLINE PERMISSION |
C |
01/11/2004 Monday |
Sustainable Projects Ireland Ltd |
Oxpark & Townfields Cloughjordan
|
creation of sustainable community. The development will compromise demolition of the former Lime Tree Pub & outbuildings on Main St & construct 133 homes ( includ 20 live-work units) in the form of apartment, terrace, semi-det & det house types. The buildings vary in height from one to three storeys. There will be two community buildings (950 sq. m at 1 - 2 storeys), farm and maintenance buildings (150 sq.m) & craft/enterprise/maintenance building (150 sq.m). Access is by a new street (formed by the demolition of Lime Tree Pub & outbuildings, including barn on main street) & by an upgraded entrance on Step Rd. Landscaping will include relocation of the present field drain and its restoration as a stream ( as a natural water feature), sustainable urban drainage strategies for storm water attenuation, extensive native landscaping. Community outdoor spaces will be provided. The development will include approx. 25 acres of organic farm. |
08510334 |
APPLICATION FINALISED |
PERMISSION FOR RETENTION |
C |
28/03/2008 Friday |
Sustainable Projects Ireland Ltd. |
Oxpark & Townfields Cloughjordan Co. Tipperary |
of variations to the infrastructural works as installed under permission ref. 04/51/1649 on site of the proposed eco-village |
16600971 |
DECLARED WITHDRAWN |
PERMISSION FOR RETENTION |
|
25/10/2016 Tuesday |
Sustainable Projects Ireland CLG |
Oxpark & Townfields Cloughjordan Co. Tipperary |
Bord na Mona moving bed biological reactor wastewater treatment plant consisting of two stage primary settling tanks, two aerated activated sludge tanks, final settling tank, and flow meter. The development also includes 80mm HDPE rising main from the sewage pumping station and return 80mm treated effluent rising main from the treatment plant to the sewage pumping station, where it connects to the 80mm HDPE rising main to the Tipperary County Council sewer which was approved under previous planning reference 04/51/1649 |
19600427 |
DECLARED WITHDRAWN |
PERMISSION |
|
26/04/2019 Friday |
Sustainable Projects Ireland CLG |
Ecovillage Oxpark Cloughjordan |
development of a constructed wetland and infiltration system and associated works and Retention Permission for a Bord na Mona moving bed biological reactor wastewater treatment plant consisting of two stage primary settling tanks, two aerated activated sludge tanks, final settling tank and flow meter. The development also includes 80mm HDPE rising main from the Ecovillage sewage pumping station to the existing Bord na Mona Treatment Plant; a 40mm rising main to the infiltration area and a stockproof fence surrounding the proposed infrastructure |
2260145 |
APPLICATION FINALISED |
PERMISSION |
C |
30/03/2022 Wednesday |
Ben Hutchinson |
7 Fainne Crann Cloughjordan Co Tipperary |
34 square meters of photovoltaic solar panels to the existing south facing roof of the house and all associated works. |