installation of new floating moorings with the capacity for 26 boats. The existing floating jetty will be refurbished and relocated within the harbour. Both the new and the existing floating moorings will be located entirely within the confines of the existing harbour and shall have service bollards providing water, lighting and electricity
installation of a new floating jetty, which will consist of five new finger pontoons along with an adjoining new end jetty in the inner harbour. The plan includes the relocation of an existing refurbished foul-water pump-out on the existing harbour breakwater to a more accessible and more effective location
development of a proposed floating moorings and wastewater pump-out, the proposed works involve the installation of a new floating jetty, which will consist of five new finger pontoons along with an adjoining new end jetty in the inner harbour, the plan includes the relocation and replacement of the existing refurbished foul water pump-out on the existing inner harbour wall with a new facility in a more accessible location on the harbour breakwater wall