Planning Application: 2460893 (Tipperary County Council )
File Number:
2460893
Application Type:
PERMISSION
Planning Status:
INCOMPLETED APPLICATION
Received Date:
17/10/2024
Decision Due Date:
Validated Date:
Invalidated Date:
21/10/2024
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Decision Date:
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
20/11/2024
Applicant Details
Applicant name:
Technopath Manufacturing Ltd
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
- A single storey extension to the northern end of the Production/Administration Building - New single storey link corridor between Production/Administration Building and Warehouse - New single storey extension accessed from new Link Corridor - Retention of existing single storey refrigeration building with new connection to new corridor - Relocation of containerised refrigeration unit from the northern end of Production/Administration Building to be connected to new link corridor - Retention of 2nr. existing containerised refrigeration units to the south-west of unit 2 - New first floor windows to north elevation of Production/Administration Building - All associated ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application
Development Address:
Technopath Manufacturing Ltd, Fort Henry Business Park, Ballina, Co. Tipperary V94FF1P
alterations and extension to two existing warehouse/industrial units and the construction of new warehousing/industrial units to form an industrial estate of 4 separate buildings, with revised road access and sightlines, new internal road network, sewage treatment plant and ancillary site development - 06511048
alterations and extension to warehouse/industrial unit number 3 and associated revisions to the site layout plan approved under planning reference 06511048; 09510187
(a) proposed reconfiguration of units 3A-3G2 resulting in an internal floor increase of 300m2, including minor elevation and office height changes relevant ref. 09510187, (b) permission for retention of 1033m2 first floor office accommodation to units 3H-3L relevant reference 09510187, (c) proposed new 2180 m2 ground floor and first floor extension to units 3H-3L, (d) proposed new 1360 m2 local ground floor and new first floor office accommodation to unit 1 relevant reference 06511048 (e) and new pedestrian covered walkway, new local internal road network and local new building signage.
3 temporary refrigeration units, air handling units & generator, a gas compound, bin storage area all located in the adjoining rear yard, the amalgamation of unit 3M to units 3H to 3L, extension to first floor area within unit 3L. Modifications to previously approved Planning reference 13510354. The modifications include the as built building works, internal alterations, the extension and reconfiguration of north east corner of units 3J, 3H 3I, elevational changes, parking and associated site works.
Technopath Life Sciences Park Fort Henry Ballina, Co. Tipperary
decommissioning the existing wastewater treatment system and constructing a new wastewater treatment system with overground tankage up to 6.5m high with ancillary civil works such as drainage, roads, fencing and landscaping at existing facility.
A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application.