Planning application details ref: 2360074 Westmeath CoCo

100%100% Complete (warning)

Planning Application: 2360074 (Westmeath CoCo)
File Number: 2360074
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 28/03/2023 Decision Due Date: 22/11/2023
Validated Date: 28/03/2023 Invalidated Date:
Further Info Requested: 22/05/2023 Further Info Received: 28/09/2023
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 22/11/2023
Leave to Appeal: Appeal Date: 19/12/2023
Commenced Date: Submissions By: 01/11/2023

Applicant Details

Applicant name: Akiyda Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: development consisting of a 10 year permission for the provision of a total of 332no. residential units along with provision of a crèche. Particulars of the development comprise as follows: (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The provision of a total of 172no. 2storey residential dwellings which will consisting of 152no. 3 bed units and 20no. 4 bed units. (c) The provision of a total of 160no. apartments/duplex units consisting of 36no.1 bed units, 99no.2bed units and 25no. 3bed units. The apartment blocks range in height from 2 storey to 4 storey and the duplex blocks range from 2 storey to 3 storey in height. (d) Provision of a 2 storey creche. (e) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche, duplexes and apartment units. (f) Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site. (g) Provision of associated bicycle storage facilities at surface level throughout the site and bin storage facilities. (h) The provision of a new link road via adjacent lands to the west to provide for vehicular, pedestrian and cyclist access. (i)The provision of internal culverts and associated bridges along with a realignment of a section of an existing drainage channel within the site to facilitate internal access roads along with associated crossing points across the drainage channel (to facilitate pedestrian, cyclist and vehicular crossing points). (j)The creation of a pedestrian footpath alongside the local road which will connect to the existing footpath aligning the N55 National road; (k)Provision of associated open space areas, residential communal open space areas to include formal play areas along with all hard and soft landscape works for private gardens and amenity spaces along with public lighting, planting and boundary treatments to include boundary walls, railings & fencing; (l)Provision of 2no. ESB substations. (m)Internal site works and attenuation systems. (n)All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul, water and ESB networks. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development
Development Address: Lands at Ballykeeran and Cornmaddy Townlands, Athlone, Co Westmeath
Architect Name: Location Key: BALLYKEERAN
Electoral Division: Planner: Yvonne Haughey
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 22/11/2023 Manager Order: MG7869
Decision Type: Conditional Number of Conditions: 21
Downloads a Microsoft Word Document (Document Size 39 Kb)

Download a Free Word viewer
Grant Date: Grant Managers Order #:
Section 47 Apply?: Yes Part 5 Apply?: Yes
Expiry Date: 15/04/2029
Decision Description: development consisting of a 10 year permission for the provision of a total of 332no. residential units along with provision of a crèche. Particulars of the development comprise as follows: (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The provision of a total of 172no. 2storey residential dwellings which will consisting of 152no. 3 bed units and 20no. 4 bed units. (c) The provision of a total of 160no. apartments/duplex units consisting of 36no.1 bed units, 99no.2bed units and 25no. 3bed units. The apartment blocks range in height from 2 storey to 4 storey and the duplex blocks range from 2 storey to 3 storey in height. (d) Provision of a 2 storey creche. (e) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche, duplexes and apartment units. (f) Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site. (g) Provision of associated bicycle storage facilities at surface level throughout the site and bin storage facilities. (h) The provision of a new link road via adjacent lands to the west to provide for vehicular, pedestrian and cyclist access. (i)The provision of internal culverts and associated bridges along with a realignment of a section of an existing drainage channel within the site to facilitate internal access roads along with associated crossing points across the drainage channel (to facilitate pedestrian, cyclist and vehicular crossing points). (j)The creation of a pedestrian footpath alongside the local road which will connect to the existing footpath aligning the N55 National road; (k)Provision of associated open space areas, residential communal open space areas to include formal play areas along with all hard and soft landscape works for private gardens and amenity spaces along with public lighting, planting and boundary treatments to include boundary walls, railings & fencing; (l)Provision of 2no. ESB substations. (m)Internal site works and attenuation systems. (n)All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul, water and ESB networks. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development

Appeal Details


Appeal Details
Notification Date: 20/12/2023 BP Reference #: ABP-318736-23
Appeal Type: THIRD PARTY File Forward Date:
Submission Due Date: 25/01/2024 Submission Sent Date:
Appeal Decision: MODIFIED Decision Date: 16/04/2024
Withdrawn Date: Dismissed Date:
Reason: Proper planning