Planning Application: 17544 (Wicklow County Council )
File Number:
17544
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
15/05/2017
Decision Due Date:
09/07/2017
Validated Date:
15/05/2017
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
05/07/2017
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
18/06/2017
Applicant Details
Applicant name:
David O'Brien & Grainne Birdthistle
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
refurbishment and reordering of interior features, involving their replacement with mezzanine floor and spiral staircase, reordering of attic to loft, their replacement with a mezzanine floor and spiral staircase, reordering of attic to loft, incorporation of breathable insulation to external walls of apartment, incorporation of panelling to walls of living room, replacement of kitchen units and fittings, removal of closet to kitchen and replacing door with niche, removal of 1970s screen to kitchen, and insertion of new screen to corridor to form new kitchen and dining area, incorporation of new enlarged family bathroom at location of existing show and boiler room, subdivision of boiler room with new door to new utility, removal of closet to corridor and its replacement with niche to new kitchen dining area, closing of door to existing bedroom 3 and the conversion of this room to utility, refurbishment of conversion of this room to utility, refurbishment of existing WC and existing ensuite bathroom, replacement of 1970s glazed doors. Refurbishment of all existing windows, the glazing of the existing dormer windows, the installation of an air / water heat pump in the garden, and all associated site works
Development Address:
Amber, Violet Hill, Herbert Road, Bray, Co. Wicklow
refurbishment and reordering of interior features, involving their replacement with mezzanine floor and spiral staircase, reordering of attic to loft, their replacement with a mezzanine floor and spiral staircase, reordering of attic to loft, incorporation of breathable insulation to external walls of apartment, incorporation of panelling to walls of living room, replacement of kitchen units and fittings, removal of closet to kitchen and replacing door with niche, removal of 1970s screen to kitchen, and insertion of new screen to corridor to form new kitchen and dining area, incorporation of new enlarged family bathroom at location of existing show and boiler room, subdivision of boiler room with new door to new utility, removal of closet to corridor and its replacement with niche to new kitchen dining area, closing of door to existing bedroom 3 and the conversion of this room to utility, refurbishment of conversion of this room to utility, refurbishment of existing WC and existing ensuite bathroom, replacement of 1970s glazed doors. Refurbishment of all existing windows, the glazing of the existing dormer windows, the installation of an air / water heat pump in the garden, and all associated site works