Please note: This application is outside the statutory period for acceptance of submissions
Planning Application: 031177 (Donegal County Council )
File Number:
031177
Application Type:
PERMISSION
Planning Status:
WITHDRAWN
Received Date:
22/12/2003
Decision Due Date:
Validated Date:
22/12/2003
Invalidated Date:
Further Info Requested:
12/02/2004
Further Info Received:
30/07/2004
Withdrawn Date:
23/11/2005
Extend Date:
Decision Type:
Decision Date:
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
25/01/2004
Applicant Details
Applicant name:
NORTH WEST WIND LTD
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
CONSTRUCTION OF 7 NO. WIND TURBINES WITH 60M, HUB HEIGHT AND 33M, BLADE 6.5M WIDE ACCESS TRACKWAYS, A 40M ANEMOMETER MAST AND ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF 1 NO. WIND TURBINES,65 METER HUB HEIGHT, AND 90 METER ROTOR DIAMETER,ACCESS TRACKWAYS 4.5 METERS IN WIDTH, AND ASSOCIATED SITE DEVELOPMENT WORKS
THE REALIGNMENT OF THE ACCESS ROAD PERMITTED UNDER REF 13/50440 TO A WINDFARM PERMITTED UNDER PLANNING PERMISSION PL 05.226845 AND THE CONSTRUCTION OF A NEW ENTRANCE ONTO THE L-1525-1 TO SERVE PERMITTED TURBINE NO.1
ERECTION OF 3 NO. WIND TURBINES WITH A HUB HEIGHT UP TO 69M AND A MAXIMUM BLADE TIP HEIGHT UP TO 110M, UNDERGROUND CABLING, BORROW PIT, TOGETHER WITH ASSOCIATED ACCESS ROADS, HARDSTANDS, CLEARFELLING APPROXIMATELY 2.488HA OF TREES AND SITE WORKS. THE DEVELOPMENT ALSO PROPOSES A GRID CONNECTION VIA AN ELECTRICAL CONNECTION INTO THE NEARBY KILLIN HILL 38kV SUB-STATION CONSISTING OF C.1,245M OF UNDERGROUND DUCTED CABLE IN THE TOWNLANDS OF ALTCOR AND MEENAGRANOGE, AND A 332.2M2 EXTENSION TO KILLIN HILL 38kV SUB-STATION IN MEENAGRANOGE. AN APPROPRIATE PERIOD OF 5 YEARS (I.E. DURATION OF THE PLANNING PERMISSION TO CONSTRUCT THE DEVELOPMENT) IS SOUGHT, WITH AN OPERATIONAL LIFE OF 30 YEARS AFTER THE DATE OF COMMISSIONING. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT AND NATURA IMPACT STATEMENT WILL ACCOMPANY THIS APPLICATION
AMENDMENTS TO THE DEVELOPMENT PERMITTED UNDER AN BORD PLEANÁLA REF. 308419-20 (PLAN REF. NO. 20/51028 REFERS) FOR THE CONSTRUCTION OF A NEW ON-SITE 38 KV AND 20KV SUBSTATION AND ALL ASSOCIATED WORKS WITHIN THE CONSENTED RED LINE BOUNDARY