Planning Application: 1551088 (Donegal County Council )
File Number:
1551088
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
20/08/2015
Decision Due Date:
14/10/2015
Validated Date:
20/08/2015
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
08/10/2015
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
23/09/2015
Applicant Details
Applicant name:
KILLIN HILL WINDFARM LIMITED
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
THE REALIGNMENT OF THE ACCESS ROAD PERMITTED UNDER REF 13/50440 TO A WINDFARM PERMITTED UNDER PLANNING PERMISSION PL 05.226845 AND THE CONSTRUCTION OF A NEW ENTRANCE ONTO THE L-1525-1 TO SERVE PERMITTED TURBINE NO.1
THE REALIGNMENT OF THE ACCESS ROAD PERMITTED UNDER REF 13/50440 TO A WINDFARM PERMITTED UNDER PLANNING PERMISSION PL 05.226845 AND THE CONSTRUCTION OF A NEW ENTRANCE ONTO THE L-1525-1 TO SERVE PERMITTED TURBINE NO.1
CONSTRUCTION OF 7 NO. WIND TURBINES WITH 60M, HUB HEIGHT AND 33M, BLADE 6.5M WIDE ACCESS TRACKWAYS, A 40M ANEMOMETER MAST AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF 3 NO. WIND TURBINES, 64 METRE HUB HEIGHT, AND 71 METRE ROTOR DIAMETER, ACCESS TRACKWAYS 4.5 METERS IN WIDTH, A 38KV SUBSTATION, A 40 METRE HIGH METEROLOGICAL MEASURING MAST AND ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF 3 NO. WIND TURBINES WITH A HUB HEIGHT UP TO 69M AND A MAXIMUM BLADE TIP HEIGHT UP TO 110M, UNDERGROUND CABLING, BORROW PIT, TOGETHER WITH ASSOCIATED ACCESS ROADS, HARDSTANDS, CLEARFELLING APPROXIMATELY 2.488HA OF TREES AND SITE WORKS. THE DEVELOPMENT ALSO PROPOSES A GRID CONNECTION VIA AN ELECTRICAL CONNECTION INTO THE NEARBY KILLIN HILL 38kV SUB-STATION CONSISTING OF C.1,245M OF UNDERGROUND DUCTED CABLE IN THE TOWNLANDS OF ALTCOR AND MEENAGRANOGE, AND A 332.2M2 EXTENSION TO KILLIN HILL 38kV SUB-STATION IN MEENAGRANOGE. AN APPROPRIATE PERIOD OF 5 YEARS (I.E. DURATION OF THE PLANNING PERMISSION TO CONSTRUCT THE DEVELOPMENT) IS SOUGHT, WITH AN OPERATIONAL LIFE OF 30 YEARS AFTER THE DATE OF COMMISSIONING. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT AND NATURA IMPACT STATEMENT WILL ACCOMPANY THIS APPLICATION
No Environment Impact Assesments Associated with this Application