File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
1160299 |
APPLICATION FINALISED |
PERMISSION |
C |
22/12/2011 Thursday |
KAROL MCELHINNEY |
AGHAVEAGH BALLYBOFEY
|
DEVELOPMENT OF AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER. THE DEVELOPMENT WILL INCLUDE THE CONSTRUCTION OF A BIOLENE COVERED PRIMARY AND SECONDARY DIGESTER WITH A CO-JOINING PUMP ROOM, SEPARATE BIOLENE COVERED PRIMARY DIGESTER AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANAEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING FEED HOPPER, PRE PIT, CHP BUILDING, ELECTRICAL SUB STATION, FLARE. WORKS SHALL INCLUDE THE PROVISION OF A STONE FILLED GABION WALL EARTHERN BUND, CONCRETE APRON, ALL DRAINAGE AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS |
1351569 |
APPLICATION FINALISED |
PERMISSION |
C |
11/12/2013 Wednesday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
DEVELOPMENT OF A COMMERCIAL CENTRALISED ANEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER INVOLVING THE CONSTRUCTION OF FOUR PRIMARY DIGESTERS WITH COLLECTION DOMES, A CO-JOINING PUMP ROOM AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING:TWO FEED HOPPERS, PRE PIT,CHP BUILDING, GAS COMPRESSION & CO2 BUILDING, FLARE AND BIOGAS PURIFICATION & BOTTLING UNIT. WORKS SHALL INCLUDE THE PROVISION OF AN EARTH BUND, CONCRETE APRON, ALL DRAINAGE, ALL OTHER ASSOCIATED SITE WORKS; IMPROVED SIGHT LINES AT THE ENTRANCE TO THE SITE FROM THE R253 ROAD INVOLVING ALTERATION OF THE LEVELS OF THE R253 ROAD; TWO PASSING BAYS ON THE R253 ROAD BETWEEN ITS JUNCTION WITH THE R252 ROAD AND THE ENTRANCE TO THE SITE; AND THE WIDENING OF THE LANEWAY |
1451147 |
INCOMPLETED APPLICATION |
PERMISSION |
|
29/09/2014 Monday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
CONSTRUCTION OF (1) A FEEDSTOCK/RECEPTION BUILDING TO HOUSE FEED HOPPER, STORAGE AREA AND ASSOCIATED TANKS IN LIEU OF FEED HOPPERS APPROVED ON SITE UNDER PLANNING REF: 13/51569 (2) GAS PURIFICATION, BOTTLING PLANT AND C02 BUILDING WHICH INCLUDES 2 NO STORAGE TANKS AND 1 NO COOLING TOWER TO THE NORTHERN SIDE OF THE SITE IN LIEU OF THAT APPROVED UNDER PLANNING PERMISSION 13/51569 (3) CHP BUILDING TO THE EASTERN SIDE OF THE SITE, FLARE TO THE SOUTH WESTERN SIDE AND PRE PIT TO THE SOUTH EASTERN SIDE OF THE SITE ALL IN LIEU OF THAT APPROVED UNDER PLANNING REF: 13/51569 (4) A WEIGHBRIDGE (5) BOUNDARY RETAINING WALL AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS AND RETENTION AND COMPLETION OF A CONCRETE COVERED ACCESS ROAD AND LORRY WASH DOWN AREA TO SERVICE THE PROPOSED DEVELOPMENT |
1551066 |
INCOMPLETED APPLICATION |
PERMISSION |
|
19/08/2015 Wednesday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
A VEHICULAR ENTRANCE IN LIEU OF PROPOSED ACCESS APPROVED UNDER PLANNING REF: 14/51399. THIS ENTRANCE IS PROPOSED FROM THE ADJOINING REGIONAL ROAD R-253-1 AND REQUIRES THE DEVELOPMENT OF A SECTION OF INTERNAL ACCESS ROAD AND ASSOCIATED SITE DEVELOPMENT WORKS |
1551366 |
APPLICATION FINALISED |
PERMISSION |
C |
16/10/2015 Friday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
RETENTION AND COMPLETION FOR THE DEVELOPMENT OF A VEHICULAR ENTRANCE IN LIEU OF PROPOSED ACCESS APPROVED UNDER PLANNING REF:14/51399 AND ASSOCIATED SITE DEVELOPMENT WORKS. THE VEHICULAR ENTRANCE CONNECTS DIRECTLY WITH THE ADJOINING REGIONAL ROAD R-253-1 AND INCLUDES A NEW SECTION OF INTERNAL ACCESS ROAD WHICH CONNECTS WITH THE PREVIOUSLY APPROVED INTERNAL ROADWAY |
1650644 |
APPLICATION FINALISED |
PERMISSION |
C |
06/05/2016 Friday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
CONSTRUCTION OF AN EXTENSION CONSISTING OF AN ELECTRICAL SUBSTATION TO THE CONTROL BUILDING CURRENTLY UNDER CONSTRUCTION AND APPROVED UNDER PLANNING REF. NO:14/51399 |
1651267 |
INCOMPLETED APPLICATION |
PERMISSION |
|
26/08/2016 Friday |
|
ALTNAPASTE MEENAGRAUV AND AGHAVEAGH BALLYBOFEY |
(1) A LAGOON FOR THE STORAGE OF SLURRY, DIGESTATE AND OTHER SLUDGES SUITABLE FOR RECOVERY THROUGH LAND SPREADING, BANKED EARTH RETAINER AND ASSOCIATED DRAINAGE WORKS (2) UNDERGROUND PUMPED PIPEWORK TO SERVICE THE PROPOSED LAGOON FROM EXISTING FARM AND APPROVED ANAEROBIC DIGESTER DEVELOPMENT CURRENTLY UNDER CONSTRUCTION UNDER PLANNING REF: 14/51399 AND (3) ASSOCIATED SITE AND ANCILLARY DEVELOPMENT WORKS |
1850910 |
APPLICATION FINALISED |
RETENTION PERMISSION |
C |
11/06/2018 Monday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
THE FLARE, PROCESS SUMP, WASHDOWN AREA,CO2 COMPRESSION BUILDING, 2 NO. CO2 TANKS AND WEIGHBRIDGE WHICH ARE IN LIEU OF THOSE APPROVED UNDER 14/51399. A BOILER HOUSE, CARBOSCAN CONTAINER, 2 NO. FURTHER CO2 TANKS, SECURITY HUT AT THE WEIGHTBRIDGE, A CONTROLS BUILDING, 3 NO. DIGESTATE DISPATCH TANK, 2 NO. TRANSFORMERS, ODUR CONTROL UNIT, OFFICE EXTENSION, EXTENSION TO THE NORTH -EAST CORNER OF THE YARD AND CLOSURE OF THE INTERNAL ROAD LINKING THE BIOGAS FACILITY TO THE WIDER GLENMORE ESTATE AT THE SOUTH EASTERN CORNER OF THE SITEAND ALL ASSOCIATED SITE WORKS ON LANDS ACCESSED OFF THE ADJOINING REGIONAL ROAD R-253-1 ASSOCIATED WITH GLENMORE ESTATES BIOGAS FACILITY |
1851521 |
WITHDRAWN |
PERMISSION |
|
03/10/2018 Wednesday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
DEVELOPMENT WORKS WHICH SHALL PROCESS ALTERNATIVE FEEDSTOCKS AND PRODUCE RENEWABLE ENERGY AND FERTILSER. THE PROPOSED DEVELOPMENT WILL BE ACCESSED VIA THE EXISTING INTERNAL CONNECTING ACCESS ROAD WITHIN GLENMORE ESTATE WHICH LINKS THE SITE THE R253. THE WORKS INVOLVE: (1) DEVELOPMENT WITHIN THE CURTILAGE OF THE EXISTING BIOGAS PLANT INVOVLING: (A) THE CONSTRUCTION/PROVISION OF AN EXTENSION TO THE EXISTING FEEDSTOCK (WASTE) RECEPTION BUILDING TO ACCOMMODATE FEEDSTOCK RECEPTION ACTIVITIES AND DIGESTATE PROCESSING EQUIPMENT, (B) GAS PURIFICATION AND COMPRESSION PLANT, (C) OFFICE EXTENSION (FIRST FLOOR OPEN PLAN) AND (D) EXTERNALLY LOCATED TEST TANK, (2) EXTENSION TO THE NORTHERN BOUNDARY OF THE BIOGAS PLANT TO ACCOMMODATE (A) INTERNAL ACCESS ROAD FROM THE EXISTING BIOGAS SITE, (B) CONCRETE RETENTION BUND, (C) 3 NO. DIGESTERS VESSELS WITH COLLECTION DOMES, (D) 3 NO. HYDROLYSIS TANKS WITH COLLECTION COVERS, (E) PUMP HOUSES (2 NO.) AND ASSOCIATED PROCESS PIPEWORK, AND (F) STORMWATER ATTENUATION TANK, PETROL INTERCEPTOR AND ASSOCIATED PIPEWORK, (3) EXTENSION TO THE NORTHERN BOUNDARY OF THE BIOGAS PLANT TO ACCOMMODATE A FERTILISER PLANT COMPRISING (A) FERTILISER PROCESSING BUILDING CONTAINING DIGESTATE PROCESSING EQUIPMENT, STORAGE AREAS AND ASSOCIATED, EXTERNALLY LOCATED, ODOUR CONTROL EQUIPMENT/EXHAUST STACK (17.5M IN HEIGHT), (B) LIQUID FERTLISER STORAGE TANKS (6 NO.), (C) HGV PARKING, (D) ALL PROCESS PIPEWORK AND ASSOCIATED DRAINAGE WORKS AND (E) ASSOCIATED SITE WORKS INCLUDING FENCING AND LANDSCAPE SCREENING THE APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) AND RELATES TO DEVELOPMENT WHICH COMPRISES AN ACTIVITY REQUIRING AN INDUSTRIAL EMISSIONS LICENCE FROM THE ENVIRONMENTAL PROTECTION AGENCY (EPA) |
1950042 |
APPLICATION FINALISED |
PERMISSION |
C |
21/01/2019 Monday |
|
GLENMORE ESTATE AGHAVEAGH BALLYBOFEY |
DEVELOPMENT WORKS AT THE GLENMORE BIOGAS PLANT, WHICH SHALL PROCESS ALTERNATIVE FEEDSTOCKS AND PRODUCE RENEWABLE ENERGY AND FERTILISER. THE DEVELOPMENT WILL BE ACCESSED VIA THE EXISTING INTERNAL CONNECTING ACCESS ROAD WITHIN GLENMORE ESTATE WHICH LINKS THE SITE TO THE R253. THE WORKS INVOLVE: (1) DEVELOPMENT WITHIN CURTILAGE OF THE EXISTING BIOGAS PLANT INVOLVING (A) THE CONSTRUCTION/ PROVISION OF AN EXTENSION TO THE EXISTING FEEDSTOCK (WASTE) RECEPTION BUILDING TO ACCOMMODATE FEEDSTOCK RECEPTION ACTIVITIES AND DIGESTATE PROCESSING EQUIPMENT, (B) GAS PURIFICATION AND COMPRESSION PLANT, (C) OFFICE EXTENSION (FIRST FLOOR OPEN PLAN) , AND (D) EXTERNALLY LOCATED TEST TANK; (2) EXTENSION TO THE NORTHERN BOUNDARY OF THE BIOGAS PLANT TO ACCOMMODATE (A) INTERNAL ACCESS ROAD FROM THE EXISTING BIOGAS SITE, (B) CONCRETE RETENTION BUND, (C) 3 NO. DIGESTERS VESSELS WITH COLLECTION DOMES, (D) 3 NO. HYDROLYSIS TANK WITH COLLECTION COVERS, (E) PUMP HOUSES (2 NO.) AND ASSOCIATED PROCESS PIPEWORK, AND (F) STORMWATER ATTENUATION TANK, PETROL INTERCEPTOR AND ASSOCIATED PIPEWORK; (3) EXTENSION TO THE NORTHERN BOUNDARY OF THE BIOGAS PLANT TO ACCOMMODATE A FERTILISER PLANT, COMPRISING (A) FERTILISER PROCESSING BUILDING CONTAINING DIGESTATE PROCESSING EQUIPMENT, STORAGE AREAS AND ASSOCIATED, EXTERNALLY LOCATED, ODOUR CONTROL EQUIPMENT/EXHAUST STACK (17.5M IN HEIGHT), (B) LIQUID FERTILISER STORAGE TANKS (6 NO.), (C) HGV PARKING, (D) ALL PROCESS PIPEWORK AND ASSOCIATED DRAINAGE WORKS, AND (E) ASSOCIATED SITE WORKS INCLUDING FENCING AND LANDSCAPE SCREENING. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) AND RELATES TO DEVELOPMENT WHICH COMPRISES AN ACTIVITY REQUIRING AN INDUSTRIAL EMISSIONS LICENCE FROM THE ENVIRIONMENTAL PROTECTION AGENCY (EPA) |