Planning Application: 17862 (Kildare County Council )
File Number:
17862
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
28/07/2017
Decision Due Date:
21/09/2017
Validated Date:
28/07/2017
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
21/09/2017
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
31/08/2017
Applicant Details
Applicant name:
Meadow Court Stud Limited
Applicant Address:
Phone Number:
Fax Number:
25179004
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
development at the existing equine bloodstock facility comprising of the following: (i) partial demolition of the roof and first-floor level of existing stables (867sqm) with refurbishment works (683sqm) to include rooflights and solar panels on south-facing roofslope; (ii) provision of 2 no. new stable blocks (250sqm in total), to be located adjacent to existing stable blocks and to include rooflights and solar panels on south-facing roofslope; (iii) demolition of existing service and machinery shed (1,007sqm) and provision of replacement machinery and storage shed (422sqm); (iv) demolition of farm manager's accommodation (140sqm) and provision f new stud farm offices (143sqm) with solar panel on south-facing roofslope; (v) demolition of existing 2 no. horse walkers (370sqm in total) and installation of 2 no. new horse walkers (370sqm in total); (vi) upgrade of paddocks; (vii) resurfacing of existing hard landscaping around stables and machinery shed and resurfacing of internal stable courtyard and surround areas; (viii) removal of existing septic tank and installation of 2 no. new EPA compliant wastewater treatment systems, each comprising treatment plant and tertiary treatment filter, stormwater drainage to include 2 no. rainwater harvesting tanks, new connection to existing watermain and installation of below ground fire-fighting water tank (135m3), and installation of 71m3 below=ground effluent storage tank (compliant with Nitrate Regulations); and, (ix) the development will also include staff and visitor car parking, internal roads/avenue upgrade, ESB substations, hard and soft landscaping, boundary treatments and all associated works necessary to facilitate the development
development at the existing equine bloodstock facility comprising of the following: (i) partial demolition of the roof and first-floor level of existing stables (867sqm) with refurbishment works (683sqm) to include rooflights and solar panels on south-facing roofslope; (ii) provision of 2 no. new stable blocks (250sqm in total), to be located adjacent to existing stable blocks and to include rooflights and solar panels on south-facing roofslope; (iii) demolition of existing service and machinery shed (1,007sqm) and provision of replacement machinery and storage shed (422sqm); (iv) demolition of farm manager's accommodation (140sqm) and provision f new stud farm offices (143sqm) with solar panel on south-facing roofslope; (v) demolition of existing 2 no. horse walkers (370sqm in total) and installation of 2 no. new horse walkers (370sqm in total); (vi) upgrade of paddocks; (vii) resurfacing of existing hard landscaping around stables and machinery shed and resurfacing of internal stable courtyard and surround areas; (viii) removal of existing septic tank and installation of 2 no. new EPA compliant wastewater treatment systems, each comprising treatment plant and tertiary treatment filter, stormwater drainage to include 2 no. rainwater harvesting tanks, new connection to existing watermain and installation of below ground fire-fighting water tank (135m3), and installation of 71m3 below=ground effluent storage tank (compliant with Nitrate Regulations); and, (ix) the development will also include staff and visitor car parking, internal roads/avenue upgrade, ESB substations, hard and soft landscaping, boundary treatments and all associated works necessary to facilitate the development
development at the existing equine bloodstock facility comprising the construction of a split-level, part single, part two-storey, 4 bedroom, farm manager’s accommodation unit (310sqm) with ancillary store (40sqm) to replace farm manager’s accommodation (140sqm) demolished under Reg. Ref. 17/862. The development will also include car parking, provision of internal access road from existing avenue, landscaping, installation of new EPA compliant domestic wastewater treatment system, SUDS drainage, and all associated site development works necessary to facilitate the development
development at the existing equine bloodstock facility comprising: (i) Demolition of existing single storey, 3 bedroom stud farm accommodation unit (153sqm); (ii) Construction of a replacement single storey, 3 bedroom staff accommodation unit (182sqm); (iii) Construction of a new single storey farm security hut/building (42sqm); and, (iv) Modifications to existing main entrance to provide new entrance gates with stone walls and piers with 2 No. new pedestrian access gates; (v) The development will also include staff and visitor car parking, upgrade to part of existing internal access road with pedestrian footpaths and security gates, decommissioning of existing septic tank and provision of new wastewater treatment system, landscaping, boundary treatments and all associated site development works necessary to facilitate the development
Development at the existing equine bloodstock facility comprising the demolition of existing farm buildings (765 sq.m) and; provision of an equine farm isolation unit comprised of (i) a stable building (294sq.m) consisting of 8 no. isolation stables with feedstore, staff room and treatment room. The building includes roof lights on the roof slope; (ii) new entrance gates and piers at existing farmyard entrance and new tree lined access road to the isolation yard, with a side road off it to a residential dwelling (currently under refurbishment) on adjacent lands; (iv) a new hay barn/machinery store (104 sq.m), slurry pit (124 sq.m) and a horse loading ramp located north of the proposed isolation unit (v) The development will also include provision of effluent treatment system, landscaping boundary treatments and all associated site development works necessary to facilitate the development
No Environment Impact Assesments Associated with this Application