Planning application details ref: 221016 Kildare County Council

100%100% Complete (warning)

Planning Application: 221016 (Kildare County Council )
File Number: 221016
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 19/08/2022 Decision Due Date: 20/11/2022
Validated Date: 19/08/2022 Invalidated Date:
Further Info Requested: 11/10/2022 Further Info Received: 24/10/2022
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 17/11/2022
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By:

Applicant Details

Applicant name: Island Stability Services Ltd.,
Applicant Address:
Phone Number: Fax Number: 23824925
Corresp. Address:

Applicant Details


Proposed Development

Development Description: 10 year planning permission to develop a synchronous condenser grid support facility, which will connect to the adjoining ESB Dunnstown Electricity Substation in the townland of Dunnstown, Brannockstown, Naas, Co. Kildare. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c.1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. c.12m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c. 160sqm., c.3m high); 6 No. modular containers to house electrical and control equipment (total area of c.195 sqm., c.5m high): a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant. 1 No. firefighting water tank, above ground oil separator and collection pit, c. 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other ancillary and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing any lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (ESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in Section 2(1) of the Electricity Regulation Act 1999
Development Address: Dunnstown,, Brannockstown,, Naas,, Co. Kildare
Architect Name: Location Key: DUNNSTOWN BRANNOCKSTOWN
Electoral Division: Planner: Niall Sheehan
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 17/11/2022 Manager Order: DO43347
Decision Type: Conditional Number of Conditions: 29
Grant Date: 25/01/2023 Grant Managers Order #: DO43347
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 24/01/2033
Decision Description: 10 year planning permission to develop a synchronous condenser grid support facility, which will connect to the adjoining ESB Dunnstown Electricity Substation in the townland of Dunnstown, Brannockstown, Naas, Co. Kildare. The proposed development will have a projected life span of 50 years. At the end of life the proposed development can either be decommissioned or refurbished to extend its life. The development is to be located within a site compound c.1 ha. It will regulate reactive power on the electricity network and will consist of the following elements: a building (c. 540 sqm. c.12m high) to house equipment including a synchronous condenser with flywheel, lube oil skid, air compressor and pumps. Equipment to be located outside the footprint of the building but within a fenced compound will include cooling equipment (c. 160sqm., c.3m high); 6 No. modular containers to house electrical and control equipment (total area of c.195 sqm., c.5m high): a step-up transformer, an auxiliary transformer, an external circuit breaker, electrical balance of plant. 1 No. firefighting water tank, above ground oil separator and collection pit, c. 100m of underground cabling ducts and cable to the adjoining ESB substation, balustrade boundary fencing, security entrance gate and CCTV, all other ancillary and miscellaneous site works to include site clearance, site access, internal roads and development of areas of hard standing any lay-down area. The proposed development will connect by underground cable to the Electricity Supply Board (ESB) 220kV substation adjoining the western boundary of the proposed development site. This underground cabling will not form a part of the transmission networks as defined in Section 2(1) of the Electricity Regulation Act 1999

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: