File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
021143 |
INCOMPLETED APPLICATION |
PERMISSION |
|
24/06/2002 Monday |
Barrettstown Gang Fund Lt |
Barrettstown Castle Ballymore Eustace Co. Kildare |
For (i) single storey extension to existing medical block at side and rear (area 78m2), change of use and modifications to existing laundry/storage block adjacent to medical block as new medical block extension of 1 no. bedroom, 3 no. observation roo |
072374 |
APPLICATION FINALISED |
PERMISSION |
C |
10/10/2007 Wednesday |
Barretstown Gang Camp Fund Ltd |
Barretstown Castle Ballymore Eustace Co. Kildar |
demolition of an open barn and construction of a two storey multi purpose activity centre to accommodate camp activities as well as ancillary functions such as Barretstown Charity etc |
10708 |
APPLICATION FINALISED |
PERMISSION |
C |
13/07/2010 Tuesday |
Barretstown Gang Camp Fund Ltd |
Barretstown Castle Ballymore Eustace Co Kildare |
The development is similar in nature to that previously approved under reg ref. 07/2374, in providing for children’s camp activities and related charity events, and is located to the northwest of former stable buildings. The accommodation comprises a main sports / recreational hall with ancillary rooms, reception area, meeting rooms, stores and sanitary accommodation. The total gross floor area is 1,163sq.m. Associated site works include surface water soakways, connection to existing waste water treatment system and landscaping. Barrettstown Castle is a protected structure, and is listed as no. KD024-029 on the Sites and Monuments Record. |
11250 |
INCOMPLETED APPLICATION |
PERMISSION |
|
16/03/2011 Wednesday |
Barretstown Gang Camp Fund |
Barretstown Castle Ballymore Eustace Co. Kildare |
for development at Barretstown Castle, a Protected Structure, listed as no. KD024-029 on the Sites and Monuments Record. The proposal is for a 16.5sq.m single-storey extension to each of nine residential cottages, providing additional shower/toilet facilities only. The combined gross floor area is 148.5sq.m |
12108 |
APPLICATION FINALISED |
PERMISSION |
C |
17/02/2012 Friday |
Barretstown Gang Camp Fund Ltd |
Barretstown Castle Ballymore Eustace Co Kildare |
The development is an amendment to previously approved sports/recreational hall and ancillary meeting rooms (reg. ref. 10/708), to provide a training room of 152sq.m. to the west elevation , and two new escape doors on the south elevation, of the main hall. Barrettstown Castle is a protected structure and listed as KD024-029 |
12139 |
APPLICATION FINALISED |
PERMISSION |
C |
17/02/2012 Friday |
Barretstown Gang Camp Fund Ltd. |
Barretstown Castle Ballymore Eustace Co. Kildare. |
Amendment to previously approved sports/recreational hall and ancillary meeting rooms (Reg. Ref. 10/708) to include the provision of changing rooms/showers of 42 sq m to the east elevation of the main hall, and the lowering of the sports hall roof by 2.65 m. This is a protected strusture and listed as KD024-029 on the Sites and Monuments Record, |
12140 |
APPLICATION FINALISED |
PERMISSION |
C |
17/02/2012 Friday |
Barretstown Gang Camp Fund Limited |
Barretstown Castle Ballymore Eustace Co. Kildare. |
The construction of 2 No. single storey residential cottages to the south-west of the castle, each 142 sq m in area and containing a dormitory, staff rooms and toilets. These cottages were previously approved under Reg. Ref. 93/742 but were not constructed. This is a protected sturcture and listed as KD024-029 on the Sites and Monuments Record, |
15766 |
APPLICATION FINALISED |
PERMISSION |
C |
26/08/2015 Wednesday |
Barretstown Gang Camp Fund Limited |
Barretstown House Ballymore Eustace Co. Kildare. |
Construction of a new single storey stand-alone dining hall pavilion building with an area of 894 square metres to accommodate 250 diners. The building is raised on a suspended ground floor set on mini-piles above the existing ground and small pond and arranged around a new internal entrance courtyard which is formed around the existing trees. The roof is an exposed laminated timber lattice roof structure, with natural wood clad walls and glazed doors. The accommodation includes appropriate dining areas, servery areas, seating space, circulation areas, restrooms, kitchen, bin stores, stage area, external dining area and all related ancillary services and site works, all on an estate of approximately 210 hectares. Barretstown Castle is a National Monument RMP KD 024-029, |
171209 |
APPLICATION FINALISED |
PERMISSION |
C |
27/10/2017 Friday |
|
Barretstown Castle, Ballymore Eustace, Co. Kildare. |
the construction of a new three storey stand-alone volunteer’s accommodation lodge with a site area of 3542sqm and gross floor area of 975sqm to accommodate 82-88 bed spaces. Works include the demolition of a 1990’s disused dining hall (633sqm) and renovation works to the existing one storey courtyard buildings of 61sqm. The building height is 13.22 metres above FFL to the ridge height. The accommodation includes 22 bedrooms with ensuite bathrooms on all three floors, lounge and meeting areas at ground floor level and all related ancillary services and site works, all on an estate of approximately 210 hectares. The proposed development is in the curtilage of Barretstown House, RPS B24-27, and the attached Barretstown Castle, National Monument KD024-029, |
181177 |
INCOMPLETED APPLICATION |
PERMISSION |
|
26/09/2018 Wednesday |
|
Barretstown Castle, Ballymore Eustace, Co. Kildare W91 RDX6. |
the construction of a new canopy to cover an existing amphitheatre with associated access improvements to the existing amphitheatre including lighting of pathways and below new canopy structure. The site area is 0.1124. The canopy structure is 10.5 metres above the FFL to the top of build. The proposed application is within 75 metres of Barretstown House, RPS B24-27 and is also associated with Barretstown Castle, National Monument KD024-029. The site location is towards the central north west of the site curtilage, set within a wooded area at Barretstown, |
181337 |
APPLICATION FINALISED |
PERMISSION |
C |
06/11/2018 Tuesday |
|
Barretstown, Barretstown Castle, Ballymore Eustace, Co.Kildare, Ireland, |
The construction of a new canopy to cover an existing amphitheatre with associated access improvements to the existing amphitheatre including lighting of pathways and below new canopy structure. The site area is 0.1124 hectares. The canopy structure is 10.5 metres above the FFL to the top of build. The proposed application is within 75 metres of Barretstown House, RPS B24-27 and is also associated with Barretstown Castle, National Monument KD024-029. The site location is towards the central north west of the site curtilage, set within a wooded area, |
19708 |
APPLICATION FINALISED |
PERMISSION |
C |
24/06/2019 Monday |
Aiden Kane, |
Marshalstown House, Marshalstown, Castledermot, |
the erection of an extension to existing loose sheds, milking parlour and collecting yard, cattle handling area, dairy, machine room, farm office, slatted tanks, meal bin, unroofed silage pit, manure pit, effluent tank, concrete yards and ancillary works. Marshalstown House is a protected structure, Ref. B38-14 in Kildare County Development Plan. Development at this site |
20818 |
APPLICATION FINALISED |
RETENTION |
C |
27/07/2020 Monday |
Barretstown Gang CampFund Mairead Forristal (Company Secretary), |
Barretstown Castle, Barretsown, Ballymore Eustace, |
of existing single story detached log cabin style structure used as a Sensory Room ancillary to the activities carried out at Barretstown and all associated site works. The development is within the curtilage of Barretstown House RPS B24-27 and is also associated with Barretstown Castle, National Monument KD 024-029 |
201599 |
APPLICATION FINALISED |
PERMISSION |
C |
22/12/2020 Tuesday |
Barretstown, |
Barretstown Castle, Ballymore Eustace, Co. Kildare. |
the material change of use and refurbishment of an existing courtyard accommodation block from camp accommodation to 2 No. new film and recording studios of 364sqm in area. The proposed development is located at Barretstown Castle, Ballymore Eustace. The existing building comprises 6 No. bedrooms, 1 No. nurses's station, 1 No. toilets and shower area. The proposed change of use and refurbishment works are to include: New performers' green room. 2 new recording studios and control room. The addition of some decorative cladding panels. Enlargement of an existing external door opening and new sliding door. 2 No. new operable canopy umbrellas for outdoor performances. All related ancillary services and site works on a site area of 403sqm. The refurbishment is located on an estate of approximately 210 hectares. The proposed development is located in the curtilage of Barretstown House, RPS B24-27, and the attached Barretstown Castle, National Monument KD024-029 |
22854 |
APPLICATION FINALISED |
PERMISSION |
C |
13/07/2022 Wednesday |
Barretstown |
Barretstown Castle Ballymore Eustace Co. Kildare |
The development will consist of alterations to an existing medical centre, located in a single-storey 19th/early 20th century courtyard building, the demolition of a late 20th century single-storey lean-to structure of c. 56.7 sqm, and the construction of a new, single-story light-weight extension within a former walled garden. The proposed development will maintain the existing medical use, providing an improved medical centre facility for Barretstown to include: - A proposed new, light-weight, single-storey, entrance lobby structure of c. 7.57 sqm. facing the existing courtyard to the west. - The adaption of the existing courtyard building comprising the replacement and upgrade of the existing roof with a new slate roof to match the existing, the internal thermal upgrade of the existing perimeter walls and the internal reorganization of the building to provide an improved waiting area, pharmacy, dispensary store room and W.C. - A proposed new, light-weight, single-storey extension comprising a simple, glu-lam structure, clad in metal panels. It is proposed to provide 3 no. treatment rooms, an office, reception area, 5 no. bedrooms and 4 no. accessible toilet and shower rooms. The height of the proposed extension at its highest point is c. 4.83 meters above FFL. - All related ancillary landscape, services and site works. The proposed development has a total gross internal floor area of c. 450 sqm. on a site of c. 1565 sqm. within an estate of approximately c. 210 hectares. The proposed development is located within a walled garden adjacent to Barretstown House, RPS B24-27, incorporating Barretstown Castle, Recorded Monument KD024-029. |