(1) Permission for the indefinite Retention of alterations made to planning reference 17/240. The alterations included the additional upgrade of part of the existing production building including the following: (i) Removal of part of the existing roof structure and cladding and part of the existing northern elevation cladding and associated structure (760sqm); (ii) Erection of new structure within the production building (760sqm). (2) To cover the existing floor area and to allow for an increase in height within the facility to a maximum eaves height of 8.5m and a maximum ridge height of 10.5m; (iii) Part new northern elevation including structure and cladding and (2) Permission for the upgrade of part of the existing production building to include the following: (i) Removal of part of the existing roof and wall cladding and associated structure (139sqm); (ii) Erection of new structure within the production building (139sqm) to cover the existing floor area and to allow for an increase in height within the facility to a maximum eaves height of 15.55m and a maximum ridge height of 17.29m and all associated site development works
for the existing production building to include the following (i) removal of the existing covered canopy roof structure and cladding (328m2)and (ii) erection of a new structure (328m2) to allow for increased height to a maximum eves height of 6m and a maximum ridge height of 8m with associated site development works