File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
22696 |
APPLICATION FINALISED |
PERMISSION |
C |
27/05/2022 Friday |
College Proteins |
College Proteins College Road, College Nobber, Co. Meath |
the provision of a maintenance workshop and a lorry wash either side of the existing garage and an associated internal access road; provision of a store extension and an amenity block/office extension to the existing engineering workshop; provision of a chemical store and 2 No. chemical storage tanks within bunded area; provision of a security building at the site entrance; car parking, and all associated site development and infrastructure. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence |
221214 |
APPLICATION FINALISED |
PERMISSION |
C |
16/09/2022 Friday |
College Proteins |
College Road College & Rathgillen Nobber, Co. Meath |
development will consist of the demolition of an existing garage and the provision of an Anaerobic Digestion Facility with an intake of up to 50,000 tonnes of organic feedstock material per annum. The Facility will comprise a waste reception building (incorporating workshop, control room and welfare facilities), 2 No. digester tanks, 2 No. digestate storage tanks, glycerine tank, buffer tank, pasteuriser tank, 4 No. liquid reception tanks; all of the above tanks located within a fully bunded concrete area; associated biofilter, gas flare, biogas combined heat and power plant, internal access roads, weighbridge, truck loading area and soil deposition area. The proposed development will also include all associated site development, drainage and infrastructure works above and below ground. The maximum height of the proposed development is the chimney stack associated with the biofilter at c. 18m above ground level.
The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence.
An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application. Further Information/Revised plans submitted on this application |
KA160786 |
APPLICATION FINALISED |
PERMISSION |
C |
21/07/2016 Thursday |
College Proteins |
College Proteins College Road, Nobber Co. Meath |
the application site comprises an area of c.1.47 hectares. Permission is sought for the construction of a biodiesel manufacturing facility producing up to 25,000 tonnes of biodiesel per annum. The facility comprises: a process building (maximum height of c. 23m) of c. 3,284 sqm Gross Floor Area (GFA) and associated tank farm (consisting of 12 No. external storage tanks, cooling unit, fertiliser silo, loading/uploading station); weigh bridge; security building (c. 33 sqm GFA); 22 No. car parking spaces; 5 No. HGV parking spaces; overground pipe racks linking to the existing rendering plant and wastewater treatment plant; a pipe bridge linking the process building and tank farm; and all ancillary site development, landscaping and boundary treatment works above and below ground. The maximum height of the proposed development is the c. 25 m stack adjoining the column tower of the process building. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Pollution Prevention and Control Licence (now replaced by an Industrial Emissions Licence). An Environmental Impact Statement (EIS) will be submitted to the Planning Authority with the application |
KA180183 |
APPLICATION FINALISED |
EXTENTION OF DURATION |
U |
26/02/2018 Monday |
College Proteins |
College Rd. Nobber Co. Meath |
construction of a biomass combined heat and power (CHP) plant and associated ash landfill facility adjacent to the existing meat rendering plant on the College Proteins site, located in the townlands of College and Rathgillen. The application site extends approximatley 19.25 Hectares. The Biomass CHP plant, when operating at full capacity, will be capable of processing 105,000 tonnes of biomass per annum. the proposed CHP plant has been designed to process a maximum of 52,500 tonnes per annum of meat and bone meal (MBM) and 52,500 tonnes per annum of waste organic liquids (derived from the agriculture, food and drink industries). The plant will generate some eight megawatts of electricity and will provide a net export of six megawatts for use outside the plant. The CHP plant will be housed in a single building (3130 Square metres) designed with concrete and steel structural framework and covered in metal profiled cladding. This building will house an unloading bay and fuel reception area, a fluidised bed combustion (FBC) system, a boiler system, a turbine/alternator set, a fabric filter system, a service building and an office building. There will be an induced draught (ID) fan and a flue stack for emissions to atmosphere, approximatley 40 metres in height, located outside. The proposed development also provides for two pipe connections within the existing rendering facility and the CHP plant. The new plant facility will be located to the rear (south/west) of the existing industrial plant buildings on site. The proposed process building will be approximatley 96 metres in length, 36 metres in width with a ridge height of 18.4 metres. A separate metal profiled clad enclosure (490 Square metres) will house an air cooled condenser immediately adajacent to the main process building. The condenser structure will be 35 metres in length, 14 metres in width and 15.2 metres in height. The proposed ash landfill will be located in the south- western part of the application site and will be connected to the proposed process buildings by an internal access road measuring approximatley 100 metres in length. The landfill will cater for non hazardous bed ash generated in the combustion process. It will also comprise the following elements: construction of engineered dry storage ash cells. These cells will be constructed and filled one at a time; a landfill runoff water lagoon;a temporary soil desposition area, a separate weighbridge and control office (57 square metres) |
KA190754 |
APPLICATION FINALISED |
PERMISSION |
C |
12/06/2019 Wednesday |
College Proteins |
College Road College & Garmanagh Nobber, Co. Meath |
a 10-year permission for the construction of a Solar PV Energy Development comprising installation of Solar Photovoltaic (PV) panels on ground mounted frames/support structures within existing field boundaries; underground cabling and ducting (including cable link to main College Proteins plant); 1 No. customer control building, 2 No. switchgear and transformer buildings, site perimeter (stock proof) security fence, CCTV security cameras; site access tracks; and all associated site development works. A temporary construction compound will be provided and vehicular access is via existing main access serving College Proteins. The application site includes a proposed cable route and vehicular access through the College Proteins facility that relates to development which comprises or is for the purposes of an activity requiring an Industrial Pollution Prevention and Control Licence (now replaced by an Industrial Emissions Licence) |