the development will consist of the continuance of operation of the existing permitted quarry (ABP 17.QD.0017), a lateral and vertical extension to the existing quarry including the deepening of the quarry extraction area by two extractive benches to 50m OD, within a total quarry extraction area of c. 4.5 ha, an increase in the permitted extraction rate to 200,000 tonnes per annum, provision of an aggregates and overburden stockpiling area and settlement lagoon system (c.2,000 m2), and restoration of the site to natural habitat after uses following completion of extraction, within an overall application area of c. 14.12 ha.. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application
the development will consist of the continuance of operation of the existing permitted quarry (ABP 17.QD.0017), a lateral and vertical extension to the existing quarry including the deepening of the quarry extraction area by two extractive benches to 50m OD, within a total quarry extraction area of c. 4.5 ha, an increase in the permitted extraction rate to 200,000 tonnes per annum, provision of an aggregates and overburden stockpiling area and settlement lagoon system (c.2,000 m2), and restoration of the site to natural habitat after uses following completion of extraction, within an overall application area of c. 14.12 hectares, and all for a period of 20 years. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application. Significant further information/revised plans submitted on this application
the construction of an Asphalt Plant and associated material bays, shipping office, site office, wheelwash, weighbridge and all associated site development works, landscaping and carparking with the addition of staff facilities and a puraflo wastewater treatment system, oil interceptor and a well for domestic water supply at the existing quarry as submitted under further information