Planning application details ref: 211477 Tipperary County Council

100%100% Complete (warning)

Planning Application: 211477 (Tipperary County Council )
File Number: 211477
Application Type: PERMISSION Planning Status: INCOMPLETED APPLICATION
Received Date: 07/10/2021 Decision Due Date:
Validated Date: Invalidated Date: 11/10/2021
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Decision Date:
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 10/11/2021

Applicant Details

Applicant name: ABO Wind Ireland Limited
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: a ten-year permission of a wind farm project. The development will consist of: Construction of up to 7 no. wind turbines with a maximum overall tip height of 150m, comprising a tower of between 75-95m high, to which three blades of between 55-70m in length will be attached; Associated hard stand areas at each turbine; 1 no. 30m permanent meteorological mast and all associated infrastructure and works; 1 no. 38kV electrical substation and all associated infrastructure and works; 20kV underground cables facilitating the connection of turbines to 38kV electrical substation and all associated infrastructure and works; Circa 19km of 38kV underground cabling and all associated works along public roads to facilitate the connection of the proposed 38kV wind farm electrical substation to the existing 38/110kV Doon substation in the townland of Ballyvaughan; Provision of a new site entrance on the L2035; Upgrading of existing agricultural tracks and construction of new site tracks and all associated works as required; A temporary site compound and all associated works; Demolition of 2 no. derelict buildings; Provision of 2 no. cattle underpasses circa 400m and circa 580m to the east of the new site entrance; and all associated infrastructure and site development works. The proposed underground cabling works located within the public road corridor cross Protected Structure RPS S121 (Loughcapple Bridge). An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application
Development Address: Knockroe, Kilnagranagh, Newtowndrangan, Tullowcussaun, Ballyvadlea, Ballyhomuck, Kilburry West, Milestown, Bannixtown, Quartercross, Clare More, Killusty North, Killusty South, Kiltinan, Loughcapple, Grange Beg, Miltown Britton, Mullenranky, Kilmore,, Ballinvoher, Redmondstown and Ballyvaughan, Co. Tipperary
Architect Name: Location Key: KNOCKROE
Electoral Division: Planner: None
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: Yes Protected Structure #: RPS S121
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: Manager Order:
Decision Type:
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date:
Decision Description:

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: