Planning Application: 2460006 (Tipperary County Council )
File Number:
2460006
Application Type:
PERMISSION
Planning Status:
FURTHER INFORMATION
Received Date:
05/01/2024
Decision Due Date:
Validated Date:
05/01/2024
Invalidated Date:
Further Info Requested:
28/02/2024
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Decision Date:
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
08/02/2024
Applicant Details
Applicant name:
Ballin Solar Ltd.
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
construction of an extension to the solar PV development permitted under planning application ref: PR 22/165 comprising the erection of photovoltaic panels laid out in arrays over a development area of ca. 17.44ha along with ancillary development including: 13 no. inverters (ca. 15.25m2 x 2.6m), 7 no. CCTV cameras mounted on 4m high poles, electrical and communications cabling, palisade security fencing and all ancillary works, this proposed extension development will be connected to an existing permitted solar development under planning application ref: PL 22/165 by underground cables - A Natura Impact Statement will accompany the planning application
Development Address:
Kyle and Kyleagarry, Gortdrum, Co. Tipperary, E34 VK75
construction of realignment of a public road with associated roadworks, embankments, drainage, safety barriers, fencnig drainage culvert, walls, farm access and ancilllary works and the closure of Iarnrod Eireann Level Drossing XC144, XL067
Kyleagarry, Kyle, Ballyryan East and Gortdrum Donohill Co. Tipperary
the construction of a 43MW Solar PV development comprising of ca. 155,000 no. photovoltaic panels laid out in arrays, the construction of a 38 kV substation, (ca. 114.9m2 X 4.75m tall) and transformer unit (ca. 15.25m2 X 2.4m tall) along with associated ancillary development including: 24 no. Power Hubs (ca. 15.25m” X 2.4m), which incorporate the inverters and the transformers within the same unit, 1 no. single storey communications building (11.1m” X 2.5m), 1 no. single storey client building (15.25m2 X 2.9m), 1 no. single storey equipment storage container (7.5m” X 2.7m), 15 no. CCTV cameras mounted on 4m high poles; and perimeter security fencing. The proposed development will also see the installation of ten (10 no.) ISO shipping container units for the purpose of battery storage (30.5 m” X 2.9m). The total development area will be ca. 70.5 ha
The development will consist of the construction of Solar PV development comprising photovoltaic panels laid out in arrays over a total development site area of ca. 54.5 ha, the construction of a 38KV substation (ca. 114.4m2 x 4.75m tall), a transformer unit (ca. 18m2 x 4m tall) and associated bund (ca. 55m2) along with ancillary development including: 17 no. Power Hubs (ca. 15.25m2 x 2.4) which incorporate at inverter and a transformer, 1. No. single storey communications building (11.1m2 x 2.5m), 1 no. single storey client side sub-station building (15.25m2 x 2.9) 1. No. single storey equipment storage building (7.5m2 x 2.7m), 7 no. CCTV cameras mounted on 4m high poles, perimeter security fencing and all ancillary works. NIS will be submitted with the planning application