File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
0512 |
APPLICATION FINALISED |
PERMISSION |
C |
04/01/2005 Tuesday |
NORTH WEST WIND LTD |
ALTCOR INVER |
CONSTRUCTION OF 1 NO. WIND TURBINES, 65 METER HUB HEIGHT AND 90 METER ROTOR DIAMETRE, ACCESS TRACKWAYS 4.5M IN WIDTH , AND ASSOCIATED SITE DEVELOPMENT WORKS |
0620014 |
WITHDRAWN |
PERMISSION |
|
12/01/2006 Thursday |
NORTHWEST WIND LIMITED |
ALTCOR INVER |
CONSTRUCTION OF 3 NO. WIND TURBINES, 64 METRE HUB HEIGHT, AND 71 METER ROTOR DIAMETER, ACCESS TRACKWAYS 4.5 METRES IN WIDTH, A 38 KV SUBSTATION, A 40 METRE HIGH METEROLOGICAL MEASURING MAST, AND ASSOCIATED SITE DEVELOPMENT WORKS |
0621420 |
INCOMPLETED APPLICATION |
PERMISSION |
|
09/11/2006 Thursday |
KILLIN HILL WINDFARM LIMITED |
ALTCOR AND MEENAGRANOGE INVER
|
CONSTRUCTION OF 3 NO. WIND TURBINES, 64 METRE HUB HEIGHT, AND 71 METRE ROTOR DIAMETER, ACCESS TRACKWAYS 4.5 METERS IN WIDTH, A 38KV SUBSTATION, A 40 METRE HIGH METEROLOGICAL MEASURING MAST AND ASSOCIATED SITE DEVELOPMENT WORKS |
1120162 |
APPLICATION FINALISED |
PERMISSION |
C |
29/04/2011 Friday |
ESB NETWORKS |
MEENAGRANOGE INVER |
ERECTION OF A NEW 38KV OVERHEAD LINE FROM A TEE OFF STRUCTURE ON THE EXISTING CORKERMORE 38KV LINE TO A LINE TERMINATION MAST AT THE PROPOSED SUBSTATION FOR KILLIN HILL WINDFARM |
1250607 |
APPLICATION FINALISED |
PERMISSION |
C |
12/10/2012 Friday |
KILLIN HILL WINDFARM LTD |
MEENAGRANOGE INVER DONEGAL PO |
ERECTION OF A SUBSTATION AT A LOCATION TO THE NORTH OF THE SUBSTATION PREVIOUSLY GRANTED UNDER PLANNING PERMISSION P05.226845 |
1350440 |
APPLICATION FINALISED |
PERMISSION |
C |
05/04/2013 Friday |
KILLIN HILL WINDFARM LTD |
MEENAGRANOGE INVER DONEGAL PO |
CONSTRUCTION OF AN ACCESS ROAD TO A WINDFARM PERMITTED UNDER PLANNING PERMISSION PL05.226845 |
1350794 |
APPLICATION FINALISED |
EXTENSION OF DURATION |
U |
14/06/2013 Friday |
KILLIN HILL WINDFARM LTD |
ALTCOR AND MEENAGRANOGE INVER DONEGAL PO |
CONSTRUCTION OF 3 NO. WIND TURBINES, 64 METRE HUB HEIGHT, AND 71 METRE ROTOR DIAMETER, ACCESS TRACKWAYS 4.5 METERS IN WIDTH, A 38KV SUBSTATION, A 40 METRE HIGH METEROLOGICAL MEASURING MAST AND ASSOCIATED SITE DEVELOPMENT WORKS |
1551088 |
APPLICATION FINALISED |
PERMISSION |
C |
20/08/2015 Thursday |
KILLIN HILL WINDFARM LIMITED |
MEENAGRANOGE INVER DONEGAL PO |
THE REALIGNMENT OF THE ACCESS ROAD PERMITTED UNDER REF 13/50440 TO A WINDFARM PERMITTED UNDER PLANNING PERMISSION PL 05.226845 AND THE CONSTRUCTION OF A NEW ENTRANCE ONTO THE L-1525-1 TO SERVE PERMITTED TURBINE NO.1 |