Planning Application: 1120162 (Donegal County Council )
File Number:
1120162
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
29/04/2011
Decision Due Date:
23/06/2011
Validated Date:
29/04/2011
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
10/06/2011
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
ESB NETWORKS
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
ERECTION OF A NEW 38KV OVERHEAD LINE FROM A TEE OFF STRUCTURE ON THE EXISTING CORKERMORE 38KV LINE TO A LINE TERMINATION MAST AT THE PROPOSED SUBSTATION FOR KILLIN HILL WINDFARM
ERECTION OF A NEW 38KV OVERHEAD LINE FROM A TEE OFF STRUCTURE ON THE EXISTING CORKERMORE 38KV LINE TO A LINE TERMINATION MAST AT THE PROPOSED SUBSTATION FOR KILLIN HILL WINDFARM
CONSTRUCTION OF 3 NO. WIND TURBINES, 64 METRE HUB HEIGHT, AND 71 METRE ROTOR DIAMETER, ACCESS TRACKWAYS 4.5 METERS IN WIDTH, A 38KV SUBSTATION, A 40 METRE HIGH METEROLOGICAL MEASURING MAST AND ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A NEW 38KV OVERHEAD LINE FROM A "TEE OFF STRUCTURE" ON THE EXISTING CORKERMORE 38KV LINE TO A LINE TERMINATION MAST AT THE ALREADY APPROVED SUBSTATION (12/50607) FOR KILLIN HILL WINDFARM
No Environment Impact Assesments Associated with this Application