Planning Application: 1240093 (Donegal County Council )
File Number:
1240093
Application Type:
EXTENSION OF DURATION
Planning Status:
APPLICATION FINALISED
Received Date:
16/03/2012
Decision Due Date:
10/05/2012
Validated Date:
16/03/2012
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Decision Date:
26/04/2012
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
19/04/2012
Applicant Details
Applicant name:
JAMES PEOPLES
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
DEVELOPMENT OF A 7.2 MW WINDFARM COMPRISING OF 8 NO. 900KW WIND TURBINES, WITH STEEL TOWERS AND COMPOSITE FIBRE ROTOR BLADES, OF HUB HEIGHT UP TO A MAXIMUM 55 METRES, A ROTOR DIAMETER OF UP TO MAXIMUM 44 METRES AND BASE TO BLADE TIP HEIGHT OF UP TO A MAXIMUM 77 METRES. THE DEVELOPMENT WILL ALSO INCLUDE WIND TURBINE TRANSFORMERS, A TURBINE HARDSTAND, NEW ACCESS ROADS 4.5 METRES IN WIDTH, STRENGTHENING AND WIDENING OF EXISTING ACCESS ROADS, DRAINAGE, A SUBSTATION CONTROL BUILDING WITH FENCED COMPOUND FOR ELECTRICAL EQUIPMENT, A 54 METRE HIGH METEOROLOGICAL MEASURING MAST, TEMPORARY QUARRY, UNDERGROUND COMMUNICATION AND POWER CABLES AND ALL ASSSOCIATED SITE WORKS AND ANCILLARY DEVELOPMENT
Development Address:
GARRYMORE, MILFORD
Architect Name:
Location Key:
GARRYMORE
Electoral Division:
Milford
Planner:
GRAHAM DIAMOND
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Yes
Comments:
EXTENSION OF DURATION GRANTED TO 09/12/2017 PARENT PERMISSION REF NO 07/50478
Decision
Decision Date:
26/04/2012
Manager Order:
2012PL0177
Decision Type:
Number of Conditions:
0
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
09/12/2017
Decision Description:
DEVELOPMENT OF A 7.2 MW WINDFARM COMPRISING OF 8 NO. 900KW WIND TURBINES, WITH STEEL TOWERS AND COMPOSITE FIBRE ROTOR BLADES, OF HUB HEIGHT UP TO A MAXIMUM 55 METRES, A ROTOR DIAMETER OF UP TO MAXIMUM 44 METRES AND BASE TO BLADE TIP HEIGHT OF UP TO A MAXIMUM 77 METRES. THE DEVELOPMENT WILL ALSO INCLUDE WIND TURBINE TRANSFORMERS, A TURBINE HARDSTAND, NEW ACCESS ROADS 4.5 METRES IN WIDTH, STRENGTHENING AND WIDENING OF EXISTING ACCESS ROADS, DRAINAGE, A SUBSTATION CONTROL BUILDING WITH FENCED COMPOUND FOR ELECTRICAL EQUIPMENT, A 54 METRE HIGH METEOROLOGICAL MEASURING MAST, TEMPORARY QUARRY, UNDERGROUND COMMUNICATION AND POWER CABLES AND ALL ASSSOCIATED SITE WORKS AND ANCILLARY DEVELOPMENT
DEVELOPMENT OF A 7.2 MW WINDFARM COMPRISING OF 8 NO. 900KW WIND TURBINES, WITH STEEL TOWERS AND COMPOSITE FIBRE ROTOR BLADES, OF HUB HEIGHT UP TO A MAXIMUM 55 METRES, A ROTOR DIAMETER OF UP TO MAXIMUM 44 METRES AND BASE TO BLADE TIP HEIGHT OF UP TO A MAXIMUM 77 METRES. THE DEVELOPMENT WILL ALSO INCLUDE WIND TURBINE TRANSFORMERS, A TURBINE HARDSTAND, NEW ACCESS ROADS 4.5 METRES IN WIDTH, STRENGTHENING AND WIDENING OF EXISTING ACCESS ROADS, DRAINAGE, A SUBSTATION CONTROL BUILDING WITH FENCED COMPOUND FOR ELECTRICAL EQUIPMENT, A 54 METRE HIGH METEOROLOGICAL MEASURING MAST, TEMPORARY QUARRY, UNDERGROUND COMMUNICATION AND POWER CABLES AND ALL ASSSOCIATED SITE WORKS AND ANCILLARY DEVELOPMENT
CONSTRUCTION OF AN ACCESS TRACK & ASSOCIATED SITE WORKS INCLUDING DRAINAGE AND UNDERGROUND ELECTRICAL CABLES TO SERVE PERMITTED SINGLE WIND TURBINE (PLANNING REFERENCE 16/50297 & 11/40003 REFER)
No Environment Impact Assesments Associated with this Application