(1) CONSTRUCTION OF A NEW HOUSE (244.4M2 INCLUDING BALCONY), WITH A SEPARATE DOMESTIC OFFICE AND REFLEXOLOGY STUDIO (49.1M2), WITH A GRAVELLED CURTILAGE (152.6M2), (2) INSTALLATION OF A NEW SECONDARY WASTEWATER TREATMENT SYSTEM CONSISTING OF A BIOLOGICAL AERATED FILTER TREATMENT PLANT TOGETHER WITH A TERTIARY SAND POLISHING FILTER BED OF 13.5 M2 AND (3) A STORMWATER AND DRAINAGE MANAGEMENT LAYOUT PLAN TO INCLUDE AN OIL FILTER AND PREVENT WATER TO ENTER THE POLISHING FILTER BED BEFORE IT IS DISCHARGED TO THE GROUND WITH MAINS WATER AVAILABLE ON SITE. THE TIMBER BUILDINGS ARE TO BE BUILT USING CIRCULAR HOLLOW SECTION GALVANISED COLUMNS (CHS) ON SEPARATE PAD FOUNDATIONS: 28 PADS WILL MEASURE 1M2 AND 2 PADS WILL BE 4M2. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
No Environment Impact Assesments Associated with this Application