Planning Application: 2560116 (Donegal County Council )
File Number:
2560116
Application Type:
PERMISSION
Planning Status:
APPEALED
Received Date:
31/01/2025
Decision Due Date:
29/04/2025
Validated Date:
31/01/2025
Invalidated Date:
Further Info Requested:
27/03/2025
Further Info Received:
02/04/2025
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
25/04/2025
Leave to Appeal:
Appeal Date:
22/05/2025
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
LAURA & HUGH LAW
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
(1) CONSTRUCTION OF A NEW HOUSE (244.4M2 INCLUDING BALCONY), WITH A SEPARATE DOMESTIC OFFICE AND REFLEXOLOGY STUDIO (49.1M2), WITH A GRAVELLED CURTILAGE (152.6M2), (2) INSTALLATION OF A NEW SECONDARY WASTEWATER TREATMENT SYSTEM CONSISTING OF A BIOLOGICAL AERATED FILTER TREATMENT PLANT TOGETHER WITH A TERTIARY SAND POLISHING FILTER BED OF 13.5 M2 AND (3) A STORMWATER AND DRAINAGE MANAGEMENT LAYOUT PLAN TO INCLUDE AN OIL FILTER AND PREVENT WATER TO ENTER THE POLISHING FILTER BED BEFORE IT IS DISCHARGED TO THE GROUND WITH MAINS WATER AVAILABLE ON SITE. THE TIMBER BUILDINGS ARE TO BE BUILT USING CIRCULAR HOLLOW SECTION GALVANISED COLUMNS (CHS) ON SEPARATE PAD FOUNDATIONS: 28 PADS WILL MEASURE 1M2 AND 2 PADS WILL BE 4M2. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
Development Address:
MARBLE HILL, PORTNABLAGH, LETTERKENNY PO, CO. DONEGAL
Architect Name:
Location Key:
MARBLEHILL
Electoral Division:
Ards
Planner:
LORNA RAMSEY
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Yes
Comments:
Decision
Decision Date:
25/04/2025
Manager Order:
2025PH1076
Decision Type:
Conditional
Number of Conditions:
18
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
Decision Description:
(1) CONSTRUCTION OF A NEW HOUSE (244.4M2 INCLUDING BALCONY), WITH A SEPARATE DOMESTIC OFFICE AND REFLEXOLOGY STUDIO (49.1M2), WITH A GRAVELLED CURTILAGE (152.6M2), (2) INSTALLATION OF A NEW SECONDARY WASTEWATER TREATMENT SYSTEM CONSISTING OF A BIOLOGICAL AERATED FILTER TREATMENT PLANT TOGETHER WITH A TERTIARY SAND POLISHING FILTER BED OF 13.5 M2 AND (3) A STORMWATER AND DRAINAGE MANAGEMENT LAYOUT PLAN TO INCLUDE AN OIL FILTER AND PREVENT WATER TO ENTER THE POLISHING FILTER BED BEFORE IT IS DISCHARGED TO THE GROUND WITH MAINS WATER AVAILABLE ON SITE. THE TIMBER BUILDINGS ARE TO BE BUILT USING CIRCULAR HOLLOW SECTION GALVANISED COLUMNS (CHS) ON SEPARATE PAD FOUNDATIONS: 28 PADS WILL MEASURE 1M2 AND 2 PADS WILL BE 4M2. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION