Planning Application: 1851756 (Donegal County Council )
File Number:
1851756
Application Type:
RETENTION PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
15/11/2018
Decision Due Date:
18/01/2019
Validated Date:
15/11/2018
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
10/01/2019
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
19/12/2018
Applicant Details
Applicant name:
SEAQUEST ENGINEERING LTD
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
EXTENSION AND MODIFICATION OF SINGLE STOREY DETACHED WORKSHOP APPROVED UNDER PERMISSION REF. NO. 16/51324 AND THE RELOCATION OF ENTRANCE APPROVED UNDER PERMISSION REF. NO. 11/20291
EXTENSION AND MODIFICATION OF SINGLE STOREY DETACHED WORKSHOP APPROVED UNDER PERMISSION REF. NO. 16/51324 AND THE RELOCATION OF ENTRANCE APPROVED UNDER PERMISSION REF. NO. 11/20291
1. EXCAVATIONS, ROCK BREAKING AND BACKFILLING WORKS TO LEVEL AND PREPARE THE SITE FOR DEVELOPMENT. 2. THE CONSTRUCTION OF A MANUFACTURING WORKSHOP AND STORE WITH ANCILLARY ACCOMMODATION, INCLUDING OFFICES AND STAFF WELFARE FACILITIES, DETACHED ESB SUBSTATION AND PAINT SHOP. 3. ASSOCIATED SITE WORKS TO INCLUDE FOR TRUCK TURNING YARD, STAFF PARKING, BOUNDARY FENCE AND APPROVED EFFLUENT TREATMENT SYSTEM.
ROCK BREAKING USING A CONTROLLED BLASTING TECHNIQUE TO ENABLE DEVELOPMENT ALREADY GRANTED PLANNING PERMISSION REF. NO. 11/20291 CONSISTING OF A MANUFACTURING WORKSHOP AND STORE WITH ANCILLARY ACCOMODATION AND ASSOCIATED SITR WORKS
DEVELOPMENT ADDITIONAL TO THAT APPROVED UNDER PLANNING PERMISSION REF. NO. 11/20291. 1. 2NO. ADDITIONAL BAYS TO WORK SHOP SPACE. 2. ADDITIONAL STORAGE MEZZANINE IN WORKSHOP BUILDING. 3. REVISED FIRST FLOOR LAYOUT IN WORKSHOP BUILDING. 4. ADDITIONAL BAY TO PAINT SHOP BUILDING.5. RELOCATION OF ESB SUBSTATION AND PROVISION OF PLANT ROOM. 6. EXTERNAL FUEL STORAGE COMPOUND.
(1) SITE WORKS INCLUDING REDUCED LEVEL EXCAVATIONS TO PROVIDE SUITABLE LEVELS FOR THE BUILDING, VEHICULAR ACCESS & CIRCULATION. THE EXCAVATION WORK MAY NECESSITATE ROCK BREAKING USING A CONTROLLED BLASTING TECHNIQUE IN CONJUNCTION WITH MECHANICAL ROCK BREAKING ACTIVITY. THE WORKS WILL NECCESSITATE STOCKPILING OF EXCAVATED ROCK MATERIAL ON SITE (2) SINGLE STOREY EXTENSION TO EXISTING MANUFACTURING WORKSHOP (3) CONSTRUCTION OF A SINGLE STOREY DETACHED WORKSHOP BUILDING. (4) ASSOCIATED SITE WORKS INCLUDING EXTENSION OF EXISTING HARD SURFACED YARD AND BOUNDARY FENCE
CONSTRUCTION OF A 30 METER MULTI-USER LATTICE MOBILE AND BROADBAND TOWER WITH DELTA HEADFRAME CARRYING TELECOMMUNICATIONS EQUIPMENT, TOGETHER WITH ASSOCIATED EQUIPMENT AND CABINETS ENCLOSED WITHIN A 2.4M PALISADE FENCE COMPOUND
(1) CONSTRUCTION OF A SINGLE STOREY EXTENSIONS TO EXISTING MANUFACTURING WORKSHOP CONSISTING OF ADDITIONAL WORKSHOP SPACE, STAFF CANTEEN AND CHANGING FACILITITES (2) SITE WORKS INCLUDING THE INSTALLATION OF A PROPRIETARY STORM WATER ATTENUATION SYSTEM TO REPLACE THE EXISTING SWALE ATTENUATION ARRANGEMENT