Planning Application: 2050291 (Donegal County Council )
File Number:
2050291
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
10/03/2020
Decision Due Date:
04/05/2020
Validated Date:
10/03/2020
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Refused
Decision Date:
25/06/2020
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
13/04/2020
Applicant Details
Applicant name:
SHANNAGH WIND FARM LIMITED
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
FOR A PERIOD OF TEN YEARS FOR THE ADDITION OF TWO WIND TURBINES TO THE EXISTING THREE TURBINE WINDFARM. THE DEVELOPMENT WILL CONSIST OF THE FOLLOWING: CONSTRUCTION OF (1) TWO WIND TURBINES WITH HUB HEIGHTS OF UP TO 55 METRES AND AN OVERALL HEIGHT OF UP TO 77 METRES TO BLADE TIP; (2) TWO CRANE HARDSTAND AREAS LOCATED BESIDE EACH TURBINE; (3) ONE 20 KV SUBSTATION BUILDING WITH ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT (4) INTERNAL WINDFARM UNDERGROUND CABLING AND NEW SITE ACCESS TRACK AND INSTALLATION OF (1) A DRAINAGE SYSTEM FOR THE PROPOSED HARDSTANDS AND ROAD ACCESS (2) UNDERGROUND GRID CONNECTION OF APPROXIMATELY 910M IN LENGTH, PREDOMINANTELY ALONG THE EXISTING WINDFARM ACCESS ROAD NETWORK AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS
Development Address:
SHANNAGH, KILCAR, DONEGAL PO, CO. DONEGAL
Architect Name:
Location Key:
SHANNAGH
Electoral Division:
Kilcar
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
9
Comments:
The dates and timelines on this application may be affected by the Emergency Covid-19 legislation.
Decision
Decision Date:
25/06/2020
Manager Order:
2020PH0893
Decision Type:
Refused
Number of Conditions:
2
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
Decision Description:
FOR A PERIOD OF TEN YEARS FOR THE ADDITION OF TWO WIND TURBINES TO THE EXISTING THREE TURBINE WINDFARM. THE DEVELOPMENT WILL CONSIST OF THE FOLLOWING: CONSTRUCTION OF (1) TWO WIND TURBINES WITH HUB HEIGHTS OF UP TO 55 METRES AND AN OVERALL HEIGHT OF UP TO 77 METRES TO BLADE TIP; (2) TWO CRANE HARDSTAND AREAS LOCATED BESIDE EACH TURBINE; (3) ONE 20 KV SUBSTATION BUILDING WITH ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT (4) INTERNAL WINDFARM UNDERGROUND CABLING AND NEW SITE ACCESS TRACK AND INSTALLATION OF (1) A DRAINAGE SYSTEM FOR THE PROPOSED HARDSTANDS AND ROAD ACCESS (2) UNDERGROUND GRID CONNECTION OF APPROXIMATELY 910M IN LENGTH, PREDOMINANTELY ALONG THE EXISTING WINDFARM ACCESS ROAD NETWORK AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS
CONSTRUCTION OF 5 WIND TURBINES WITH A 40 METRE HUB HEIGHT AND 52 METRE ROTOR DIAMETER, ACCESS TRACKWAYS 4.5 METRES IN WIDTH, A 20KV SUBSTATION BUILDING, A METREOLOGICAL MAST 40 METRES IN HEIGHT AND ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF 3 WIND TURBINES WITH A 40 METER HUB HEIGHT AND 52 METER ROTOR DIAMETER, ACCESS TRACKWAYS 4.5METERS IN WIDTH, A20KV SUBSTATION BUILDING, A METEOROLOGICAL MEASURING MAST 40 METERS IN HEIGHT AND ASSOCIATED SITE DEVELOPMENT WORKS