CONSTRUCT A 8,460 SQ M STARTER EXTENSION AND ASSOCIATED REVISIONS TO THE SURFACE WATER DRAINAGE NETWORK TO THE EAST OF THE EXISTING RUNWAY (RUNWAY 08/26) AND THE MODIFICATION OF THE POSITION OF THE EXISTING FIVE CROSSBAR PRECISION APPROACH LIGHTING SYSTEM, LOCATED TO THE EAST OF THE EXISTING RUNWAY (RUNWAY 08/26), BY A DISTANCE OF 90 METRES TO THE EAST
(1) REMOVE EXISTING BAGGAGE CLAIM AREA TO PROVIDE NEW DEPARTURE GATE (2) CONSTRUCT A NEW EXTENSION TO MAIN AIRPORT BUILDING TO ALLOW FOR (1) SIT DOWN RESTAURANT AND BAR AREA (11) ARRIVAL AREAS (111) LUGGAGE RECLAIM AREA (1V) CUSTOMS, OFFICES, SECURITY AND WC'S AND (3) NEW COACH SET DOWN PARKING AREA AND (4) UPGRADE EXISTING WASTEWATER TREATMENT PLANT AND TO INSTALL A TERTIARY SAND POLISHING FILTER AND (5) ALL ANCILLARY SITE DEVELOPMENT WORKS