| 042697 |
APPLICATION FINALISED |
RETENTION PERMISSION |
C |
14/07/2004 Wednesday |
CYRIL LANGAN |
KILPADOGUE TARBERT
|
RETAIN HOUSE AND DOMESTIC SHEDS AND STORES |
| 1363 |
INCOMPLETED APPLICATION |
PERMISSION |
|
06/02/2013 Wednesday |
KILPADDOGE ENERGY LIMITED |
KILPADDOGE TARBERT CO KERRY |
CONSTRUCT AN ELECTRICITY PEAKER POWER GENERATING PLANT, CONSISTING OF (1) FIFTY TWO (52) DIESEL RECIPROCATING ENGINES IN ACOUSTIC CONSTAINERS, EACH WITH AN EXTERNAL 6 M3 DIESEL FUEL SUPPLY TANK.(2) TWENTY SIX (26) EMISSION STACKS TO A MAXIMUM HEIGHT OF 15M3. CONSTRUCTION.(3) CONSTRUCTION OF AN ACCESS ROAD 210M LONG AND 20M WIDTH CONNECTED TO THE L1010 TO EIRGRID SUBSTATION ROAD. (4) CONSTRUCTION OF APPROXIMATELY 60M OF 110 KV UNDERGROUND TRANSMISSION LINE. (5)CONSTRUCTION OF AN ELECTRICAL COMPOUND OF 4141 M2 FLOOR AREA CONTAINING A MAXIMUM OF TWO (2) 110KV SUBSTATIONS, MAXIMUM OF FOUR (4NO) SWITCHGEAR AND ASSOCIATED LOAD BANKS AND AUXILLARY/CONTROLS. (6) CONSTRUCTION OF A MAXIMUM OF FOUR (4) CARBON STEEL DIESEL STORAGE TANKS OF 11.8 M DIAMETER BY 6.1M HEIGHT WITH HOLDING CAPACITY OF 625M2 EACH WITH ASSOCIATED BUNDING AND ADJACENT FILLING APRON.(7) CONSTRUCTION OF A 20 M3 FIREWATER TANK. (8) CONSTRUCTION OF A CONTROL BUILDING OF 51.25M2 FLOOR AREA AND 4.0M HIGH WITH ASSOCIATED WASTE WATER HOLDING TANK. (9)SITE FENCING AND ASSOCIATED ANCILLARY SERVICES.AN ENVIRONMENTAL IMPACT STATEMENT AND NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION. THIS APPLICATION ALSO RELATES TO DEVELOPMENT WHICH COMPRISES OR IS FORTHE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION CONTROL LICENCE. |
| 13138 |
APPLICATION FINALISED |
PERMISSION |
C |
13/03/2013 Wednesday |
KILPADDOGE ENERGY LIMITED |
KILPADDOGE TARBERT CO. KERRY |
CONSTRUCT AN ELECTRICITY PEAKER POWER GENERATING PLANT, CONSISTING OF (1) FIFTY TWO (52) DIESEL RECIPROCATING ENGINES IN ACOUSTIC CONTAINERS, EACH WITH AN EXTERNAL 6 M3 DIESEL FUEL SUPPLY TANK. (2) TWENTY SIX (26) EMISSION STACKS TO A MAXIMUM HEIGHT OF 15M (3) CONSTRUCTION OF AN ACCESS ROAD 210M LONG AND 20M WIDTH CONNECTED TO THE L1010 TO EIRGRID SUBSTATION ROAD. (4) CONSTRUCTION OF APPROXIMATELY 60M OF 110 KV UNDERGROUND TRANSMISSION LINE. (5)CONSTRUCTION OF AN ELECTRICAL COMPOUND OF 4141 M2 FLOOR AREA CONTAINING A MAXIMUM OF TWO (2) 110KV SUBSTATIONS, MAXIMUM OF FOUR (4NO) SWITCHGEAR AND ASSOCIATED LOAD BANKS AND AUXILLARY/CONTROLS. (6) CONSTRUCTION OF A MAXIMUM OF FOUR (4) CARBON STEEL DIESEL STORAGE TANKS OF 11.8 M DIAMETER BY 6.1M HEIGHT WITH HOLDING CAPACITY OF 625M3 EACH WITH ASSOCIATED BUNDING AND ADJACENT FILLING APRON.(7) CONSTRUCTION OF A 20 M3 FIREWATER TANK. (8) CONSTRUCTION OF A CONTROL BUILDING OF 51.25M2 FLOOR AREA AND 4.0M HIGH WITH ASSOCIATED WASTE WATER HOLDING TANK. (9)SITE FENCING AND ASSORTED ANCILLARY SERVICES. AN ENVIRONMENTAL IMPACT STATEMENT AND NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION. THIS APPLICATION ALSO RELATES TO DEVELOPMENT WHICH COMPRISES OR IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION CONTROL LICENCE. |
| 155 |
APPLICATION FINALISED |
PERMISSION |
C |
08/01/2015 Thursday |
ELECTRICITY SUPPLY BOARD |
KILPADDOGE TARBERT CO KERRY |
ALTERATIONS TO THE EXISTING STATION CONSISTING OF 1 NO. 110/20 KV TRANSFORMER, 3 NO. 110 KV SURGE ARRESTOR, 3 NO. 110 KV CABLE SEALING ENDS, 1 NO. NEUTRAL EARTH RESISTOR, 1 NO. LIGHTNING MAST, NEW RETAINING WALL WITH HANDRAIL, NEW SINGLE STORY MV SWITCHGEAR BUILDING AND ASSOCIATED DRAINAGE AND SITE WORKS AT KILPADDOGE 220 KV STATION |
| 18878 |
APPLICATION FINALISED |
PERMISSION |
C |
10/09/2018 Monday |
SHANNON CLEAN TECH LTD |
KILPADDOGE TARBERT CO. KERRY |
FOR A 10 YEAR PERMISSION TO CONSTRUCT A BATTERY ENERGY STORAGE SYSTEM (BESS) FACILITY ON A TOTAL SITE AREA OF UP TO 0.6HA THAT WILL PROVIDE GIRD BALANCING SERVICES TO THE IRISH ELECTRICAL GRID, TO INCLUDE UP TO 26 NO. SELF-CONTAINED BATTERY CONTAINER UNITS WITH ASSOCIATED HEATING VENTILATION AND AIR CONDITIONING SYSTEMS (HVAC), POWER CONVERSION SYSTEMS (PCS), STEP-UP TRANSFORMERS, CONTROL SYSTEMS AND ANCILLARY ELECTRICAL COMPONENTS, 1 NO . SINGLE – STOREY ELECTRICITY CONTROL BUILDING, 1 NO. 110KV ESB SUBSTATION, SINGLE STOREY SUBSTATION CONTROL BUILDING AND ASSOCIATED ELECTRICAL INFRASTRUCTURE, 1 NO. 110 KV GENERATOR TRANSFORMER, ALL NECESSARY GROUND AND FOUNDATION WORKS, ASSOCIATED COMPOUND CABLING AND DUCTING, PALISADE SECURITY FENCING AND LIGHTING, CCTV SECURITY CAMERAS, NEW SITE ACCESS FROM EXISTING PRIVATE ROAD, TEMPORARY CONSTRUCTION COMPOUND AND ALL ASSOCIATED ANCILLARY INFRASTRUCTURE AND SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) IS NOW SUBMITTED IN SUPPORT OF THE APPLICATION |
| 19115 |
APPLICATION FINALISED |
PERMISSION |
C |
12/02/2019 Tuesday |
GLENCLOOSAGH ENERGY LIMITED |
KILPADDOGE TARBERT CO KERRY |
THE DEVELOPMENT WILL CONSIST OF A GRID STABILISATION FACILITY COMPRISING OF: THE CONSTRUCTION UP TO 4 NO. ROTATING STABILISERS, 5 NO. BATTERY STORAGE CONTAINERS, 1 NO. CONTROL ROOM, 2 TRANSORMERS AND ANCILLARY EQUIPMENT WITHIN A SITE AREA OF APPROX. 1.46 HECTARES. IT IS PROPOSED TO CONNECT THE PROPOSED DEVELOPMENT TO THE ADJACENT EIRGRID SUBSTATION BY UNDERGROUND CABLE WHICH WILL TRAVERSE THE PERMITTED AND UNDER CONSTRUCTION PEAKING PLANT. THE ROTATING STABILISERS WILL BE SUPPORTED BY 10 NO. ELECTRICAL EQUIPMENT ROOMS WHICH WILL CONTAIN ANCILLARY POWER SUPPLY PRODUCTS INCLUDING A STATIC FREQUENCY CONVERT (SFC), MV SWITCHGEAR, EXCITERS AND LV DISTRIBUTION, AND STEP-UP / DOWN TRANSFORMERS. A HEATING VENTILATION AND AIR CONDITIONING SYSTEM (HVAC) WILL BE ATTACHED TO EACH ROTATING STABILISER, 4 NO. AUXILIARY TRANSFORMERS ARE ALSO PROPOSED. THE BATTERY CONTAINERS WILL HOUSE INDIVIDUAL BATTERY COMPONENTS WITH 2 NO. FITTED EXTERNAL HVAC SYSTEM FOR EACH. 13 NO. INVERTER STATIONS AND 14 AUXILIARY TRANSFORMERS ARE PROPOSED FOR THE BATTERY CONTAINERS. THE ENTIRE SITE WILL CONSIST OF VARIOUS UNDERGROUND CABLES AND DUCTS, BOUNDARY SECURING FENCE, COMPOUND LIGHTING AND PALISADE GATES AND FENCING, NEW INTERNAL ACCESS TRACK, SECURITY LIGHTING, CCTV, HARDSTANDING AREAS AND ALL NECESSARY FOUNDATION WORKS. PERMISSION IS ALSO SOUGHT FOR 2 ELECTRICAL TRANSFORMERS (UP TO 220KV), ASSOCIATED HV EQUIPMENT AND UNDERGROUND ELECTRICAL GRID CONNECTION CABLING AND DUCTING CONNECTING THE DEVELOPMENT TO THE NATIONAL GRID AT THE ADJACENT ESB/EIRGRID SUBSTATION. PLANNING PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION |
| 21549 |
APPLICATION FINALISED |
PERMISSION |
C |
25/05/2021 Tuesday |
DONAL MUPRHY GLENCLOOSAGH ENERGY LIMITED |
KILPADDOGE TARBERT CO KERRY |
(A) A HIGH INTERTIA SYNCHRONOUS COMPENSATOR (HISC) COMPOUND CONTAINING 1 NO. HISC UNIT ENCLOSED WITHIN A STEEL CLAD FRAMED STYLE STRUCTURE (12.1M MAX HEIGHT) AND SUPPPORTED BY 8 NO. ELECTRICAL EQUIPMENT CONTAINERS (CONTAINING ANCILLARY POWER SUPPLY PRODUCTS INCLUDING A STATIC FEQUENCY CONVERTS, MV SWITCHGEAR, EXCITERS, LV DISTRIBUTION, CONTROL ROOM, WELFARE AND OFFICE), MAIN AUXILIARY AND START-UP ELECTRICAL TRANSFORMERS, GENERATOR CIRCUIT BREAKER, SWITCHGEAR EQUIPMENT, EXTERNAL COOLER UNITS AND 1 NO. BACK UP DIESEL GENERATOR AND ASSOCIATED DIESEL STORAGE TANK; (B) A 220KV HIGH VOLTAGE GAS INSULTATED SWITCHGEAR (GIS) SUBSTATION COMPOUND CONTAINING A GIS SUBSTATION BUILDING WITH ALL CONTROL AND HV EQUIPMENT WITHIN A SINGLE STOREY BUILDING (13.2M MAX HEIGHT). THE BUILDING WILL BE SURROUNDED BY A COMPOUND ROAD AND CONTAINED WITHIN A 2.6M HIGH GALVANISED STEEL PALISADE FENCE; (C) A BATTERY STORAGE COMPOUND CONTAINING 5 NO. BATTERY STORAGE CONTAINERS, ENCLOSED IN STEEL CONTAINERS OF DIMENSIONS APPROXIMATELY 13M BY 2.5M BY 3M, HOUSING INDIVIDUAL BATTERY COMPONENTS WITH 2 NO FITTED EXTERNAL HVAC SYSTEMS FOR EACH UNIT AND SUPPORTED BY 13 NO. INVERTER STATIONS, 14 NO. AUXILIARY TRANSFORMERS AND CONTROL CONTAINER; (D) 220KV UNDERGROUND CABLE TO THE EXISTING ADJOINING EIRGRID SUBSTATION; (E) ASSOCIATED ELEMENTS COMPRISING VARIOUS UNDERGROUND CABLES AND DUCTS, EQUIPMENT PLINTHS, BOUNDARY SECURITY FENCE, COMPOUND LIGHTING AND PALISADE GATES AND FENCING, SECUIRTY LIGHTING, CCTV, INTERNAL ACCESS ROADS, HARDSTANDING AREAS AND ALL NECESSARY FOUNDATIONS WORKS FOR THE ABOVE COMPOUNDS. THE PLANNING APPLICATION IS ON LANDS WHERE GRID STABILISATION FACILITY WAS PREVIOUSLY PERMITTED UNDER PLANNING REGISTER NO 19/115. PLANNING PERMISSION TO CONSTRUCT THE DEVELOPMENT IS SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT AND ACCOMPANIES THE APPLICATION |
| 716141 |
|
|
|
|
|
|
|
| 719939 |
|
|
|
|
|
|
|
| 801237 |
|
|
|
|
|
|
|
| 812426 |
|
|
|
|
|
|
|
| 821330 |
|
|
|
|
|
|
|
| 911376 |
APPLICATION FINALISED |
PERMISSION |
C |
27/08/1991 Tuesday |
EDWARD O'NEILL |
KILPADDOGUE TARBERT
|
EXTENSION TO DWELLING |
| 94555 |
FURTHER INFORMATION |
PERMISSION |
|
18/04/1994 Monday |
ARAN ENERGY PLC |
KILPADDOGE AND COOLNANOONAGH TARBERT |
OIL REFINERY, TANK FARM, MARINE TERMINAL AND ASSOCIATED WORKS |
| 96293 |
APPLICATION FINALISED |
OUTLINE PERMISSION |
C |
23/02/1996 Friday |
ERIC PARKINSON |
CARHOONAKINEELY TARBERT
|
CONSTRUCT A DWELLINGHOUSE & SEPTIC TANK |
| 97475 |
APPLICATION FINALISED |
APPROVAL |
C |
14/03/1997 Friday |
NORMAN PARKINSON |
CARHOONAKINEELY TARBERT
|