| File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
| 01441 |
APPLICATION FINALISED |
PERMISSION |
R |
22/02/2001 Thursday |
TARBERT RENEWABLE ENERGY LTD |
CARHOONAKINEELY, COOLNANOONAGH KILPADDOGE AND TARBERT |
CONSTRUCT A WIND FARM CONSISTING OF 23 WIND TURBINES, AN ELECTRICAL SUBSTATION WITH CONTROL BUILDING, A 40M HIGH METEOROLOGICAL MAST, UPGRADING OF SITE ENTRANCE AND CONSTRUCTION OF INERNAL SITE TRACKWAYS AND ASSOCIATED WORKS EIS RECEIVED |
| 1363 |
INCOMPLETED APPLICATION |
PERMISSION |
|
06/02/2013 Wednesday |
KILPADDOGE ENERGY LIMITED |
KILPADDOGE TARBERT CO KERRY |
CONSTRUCT AN ELECTRICITY PEAKER POWER GENERATING PLANT, CONSISTING OF (1) FIFTY TWO (52) DIESEL RECIPROCATING ENGINES IN ACOUSTIC CONSTAINERS, EACH WITH AN EXTERNAL 6 M3 DIESEL FUEL SUPPLY TANK.(2) TWENTY SIX (26) EMISSION STACKS TO A MAXIMUM HEIGHT OF 15M3. CONSTRUCTION.(3) CONSTRUCTION OF AN ACCESS ROAD 210M LONG AND 20M WIDTH CONNECTED TO THE L1010 TO EIRGRID SUBSTATION ROAD. (4) CONSTRUCTION OF APPROXIMATELY 60M OF 110 KV UNDERGROUND TRANSMISSION LINE. (5)CONSTRUCTION OF AN ELECTRICAL COMPOUND OF 4141 M2 FLOOR AREA CONTAINING A MAXIMUM OF TWO (2) 110KV SUBSTATIONS, MAXIMUM OF FOUR (4NO) SWITCHGEAR AND ASSOCIATED LOAD BANKS AND AUXILLARY/CONTROLS. (6) CONSTRUCTION OF A MAXIMUM OF FOUR (4) CARBON STEEL DIESEL STORAGE TANKS OF 11.8 M DIAMETER BY 6.1M HEIGHT WITH HOLDING CAPACITY OF 625M2 EACH WITH ASSOCIATED BUNDING AND ADJACENT FILLING APRON.(7) CONSTRUCTION OF A 20 M3 FIREWATER TANK. (8) CONSTRUCTION OF A CONTROL BUILDING OF 51.25M2 FLOOR AREA AND 4.0M HIGH WITH ASSOCIATED WASTE WATER HOLDING TANK. (9)SITE FENCING AND ASSOCIATED ANCILLARY SERVICES.AN ENVIRONMENTAL IMPACT STATEMENT AND NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION. THIS APPLICATION ALSO RELATES TO DEVELOPMENT WHICH COMPRISES OR IS FORTHE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION CONTROL LICENCE. |
| 13138 |
APPLICATION FINALISED |
PERMISSION |
C |
13/03/2013 Wednesday |
KILPADDOGE ENERGY LIMITED |
KILPADDOGE TARBERT CO. KERRY |
CONSTRUCT AN ELECTRICITY PEAKER POWER GENERATING PLANT, CONSISTING OF (1) FIFTY TWO (52) DIESEL RECIPROCATING ENGINES IN ACOUSTIC CONTAINERS, EACH WITH AN EXTERNAL 6 M3 DIESEL FUEL SUPPLY TANK. (2) TWENTY SIX (26) EMISSION STACKS TO A MAXIMUM HEIGHT OF 15M (3) CONSTRUCTION OF AN ACCESS ROAD 210M LONG AND 20M WIDTH CONNECTED TO THE L1010 TO EIRGRID SUBSTATION ROAD. (4) CONSTRUCTION OF APPROXIMATELY 60M OF 110 KV UNDERGROUND TRANSMISSION LINE. (5)CONSTRUCTION OF AN ELECTRICAL COMPOUND OF 4141 M2 FLOOR AREA CONTAINING A MAXIMUM OF TWO (2) 110KV SUBSTATIONS, MAXIMUM OF FOUR (4NO) SWITCHGEAR AND ASSOCIATED LOAD BANKS AND AUXILLARY/CONTROLS. (6) CONSTRUCTION OF A MAXIMUM OF FOUR (4) CARBON STEEL DIESEL STORAGE TANKS OF 11.8 M DIAMETER BY 6.1M HEIGHT WITH HOLDING CAPACITY OF 625M3 EACH WITH ASSOCIATED BUNDING AND ADJACENT FILLING APRON.(7) CONSTRUCTION OF A 20 M3 FIREWATER TANK. (8) CONSTRUCTION OF A CONTROL BUILDING OF 51.25M2 FLOOR AREA AND 4.0M HIGH WITH ASSOCIATED WASTE WATER HOLDING TANK. (9)SITE FENCING AND ASSORTED ANCILLARY SERVICES. AN ENVIRONMENTAL IMPACT STATEMENT AND NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION. THIS APPLICATION ALSO RELATES TO DEVELOPMENT WHICH COMPRISES OR IS FOR THE PURPOSES OF AN ACTIVITY REQUIRING AN INTEGRATED POLLUTION CONTROL LICENCE. |
| 21549 |
APPLICATION FINALISED |
PERMISSION |
C |
25/05/2021 Tuesday |
DONAL MUPRHY GLENCLOOSAGH ENERGY LIMITED |
KILPADDOGE TARBERT CO KERRY |
(A) A HIGH INTERTIA SYNCHRONOUS COMPENSATOR (HISC) COMPOUND CONTAINING 1 NO. HISC UNIT ENCLOSED WITHIN A STEEL CLAD FRAMED STYLE STRUCTURE (12.1M MAX HEIGHT) AND SUPPPORTED BY 8 NO. ELECTRICAL EQUIPMENT CONTAINERS (CONTAINING ANCILLARY POWER SUPPLY PRODUCTS INCLUDING A STATIC FEQUENCY CONVERTS, MV SWITCHGEAR, EXCITERS, LV DISTRIBUTION, CONTROL ROOM, WELFARE AND OFFICE), MAIN AUXILIARY AND START-UP ELECTRICAL TRANSFORMERS, GENERATOR CIRCUIT BREAKER, SWITCHGEAR EQUIPMENT, EXTERNAL COOLER UNITS AND 1 NO. BACK UP DIESEL GENERATOR AND ASSOCIATED DIESEL STORAGE TANK; (B) A 220KV HIGH VOLTAGE GAS INSULTATED SWITCHGEAR (GIS) SUBSTATION COMPOUND CONTAINING A GIS SUBSTATION BUILDING WITH ALL CONTROL AND HV EQUIPMENT WITHIN A SINGLE STOREY BUILDING (13.2M MAX HEIGHT). THE BUILDING WILL BE SURROUNDED BY A COMPOUND ROAD AND CONTAINED WITHIN A 2.6M HIGH GALVANISED STEEL PALISADE FENCE; (C) A BATTERY STORAGE COMPOUND CONTAINING 5 NO. BATTERY STORAGE CONTAINERS, ENCLOSED IN STEEL CONTAINERS OF DIMENSIONS APPROXIMATELY 13M BY 2.5M BY 3M, HOUSING INDIVIDUAL BATTERY COMPONENTS WITH 2 NO FITTED EXTERNAL HVAC SYSTEMS FOR EACH UNIT AND SUPPORTED BY 13 NO. INVERTER STATIONS, 14 NO. AUXILIARY TRANSFORMERS AND CONTROL CONTAINER; (D) 220KV UNDERGROUND CABLE TO THE EXISTING ADJOINING EIRGRID SUBSTATION; (E) ASSOCIATED ELEMENTS COMPRISING VARIOUS UNDERGROUND CABLES AND DUCTS, EQUIPMENT PLINTHS, BOUNDARY SECURITY FENCE, COMPOUND LIGHTING AND PALISADE GATES AND FENCING, SECUIRTY LIGHTING, CCTV, INTERNAL ACCESS ROADS, HARDSTANDING AREAS AND ALL NECESSARY FOUNDATIONS WORKS FOR THE ABOVE COMPOUNDS. THE PLANNING APPLICATION IS ON LANDS WHERE GRID STABILISATION FACILITY WAS PREVIOUSLY PERMITTED UNDER PLANNING REGISTER NO 19/115. PLANNING PERMISSION TO CONSTRUCT THE DEVELOPMENT IS SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT AND ACCOMPANIES THE APPLICATION |
| 94555 |
FURTHER INFORMATION |
PERMISSION |
|
18/04/1994 Monday |
ARAN ENERGY PLC |
KILPADDOGE AND COOLNANOONAGH TARBERT |
OIL REFINERY, TANK FARM, MARINE TERMINAL AND ASSOCIATED WORKS |