DEMOLISH EXISTING BUILDING (576 SQ.M. GROSS FLOOR AREA) LOCATED TO THE EAST OF EXISTING AIRPORT TERMINAL BUILDING AND ACCOMMODATING THE FIRE STATION, SUBSTATION AND FUEL VEHICLES AND TO CONSTRUCT 2 NO. NEW BUILDINGS WITH AN OVERALL TOTAL GROSS FLOOR AREA OF 579.20 SQ.M. TO ACCOMMODATE THESE USES, ONE BUILDING OF 448 SQ.M. GROSS FLOOR AREA WITH A MAXIMUM HEIGHT OF 8 METRES WILL ACCOMMODATE THE FIRE STATION (368 SQ.M.) AND SUBSTATION (80SQ.M.) AND WILL BE LOCATED TO THE WEST OF EXISTING AIRPORT TERMINAL BUILDING. A SECOND BUILDING OF 131.20SQ.M. GROSS FLOOR AREA AND A MAXIMUM HEIGHT OF 4.2 METRES WILL ACCOMMODATE THE FUEL VEHICLES AND WILL BE LOCATED TO THE EAST OF THE AIRPORT TERMINAL BUILDING AND TO THE NORTH-EAST OF THE EXISTING CAR PARK TO THE EAST OF THE AIRPORT. THE PROPOSED DEVELOPMENT INCLUDES ALL SITE DEVELOPMENT WORKS
(1) REMOVE EXISTING BAGGAGE CLAIM AREA TO PROVIDE NEW DEPARTURE GATE (2) CONSTRUCT A NEW EXTENSION TO MAIN AIRPORT BUILDING TO ALLOW FOR (1) SIT DOWN RESTAURANT AND BAR AREA (11) ARRIVAL AREAS (111) LUGGAGE RECLAIM AREA (1V) CUSTOMS, OFFICES, SECURITY AND WC'S AND (3) NEW COACH SET DOWN PARKING AREA AND (4) UPGRADE EXISTING WASTEWATER TREATMENT PLANT AND TO INSTALL A TERTIARY SAND POLISHING FILTER AND (5) ALL ANCILLARY SITE DEVELOPMENT WORKS
No Environment Impact Assesments Associated with this Application