Planning Application: 081676 (Kerry County Council )
File Number:
081676
Application Type:
PERMISSION
Planning Status:
INCOMPLETED APPLICATION
Received Date:
14/07/2008
Decision Due Date:
Validated Date:
Invalidated Date:
01/08/2008
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Decision Date:
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
SCART ENERGY LTD
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
SCART ENERGY LTD, 7 THE BELFRY, BALLYCOUGH, CO LIMERICK
Applicant Details
Proposed Development
Development Description:
CONSTRUCT A WINDFARM CONSISTING OF 5 NO. WIND TURBINES WITH HUB HEIGHTS OF NOT MORE THAN 85M AND AN OVERALL BLADE TIP HEIGHT OF NOT MORE THAN 120,5M WITH ACCESS ROADS, ELECTRICAL SUB-STATION, AND ANCILLARY WORKS, THE PERMISSION IS BEING SOUGHT FOR A 10 YEAR PERIOD, PREVIOUS PERMISSION FOR A WIND FARM CONSISTING OF 5 NO. TURBINES ON THIS SITE WAS GRANTED TO MAGSON HOLDINGS LTD ON 08.01.04, PLANNING REF. 03/1902, A SEPERATE APPLICATION HAS BEEN MADE FOR A FURTHER 4 NO. TURBINES ON ADJOINING LANDS, AN EIS HAS BEEN SUBMITTED
CONSTRUCT A WINDFARM CONSISTING OF 5 NO. WIND TURBINES WITH HUB HEIGHTS OF NOT MORE THAN 85M AND AN OVERALL BLADE TIP HEIGHT OF NOT MORE THAN 120.5M, WITH ACCESS ROADS, ELECTRICAL SUB STATION AND ANCILLARY WORKS
CONSTRUCT AN EXTENSION TO A WINDFARM (PREVIOUSLY GRANTED PERMISSION PLANNING REF. NO. 08/2030) CONSISTING OF 3 NO. WIND TURBINES WITH HUB HEIGHTS OF NOT MORE THAN 85M AND AN OVERALL BLADE TIP HEIGHT OF NOT MORE THAN 120.5M WITH ACCESS ROAD AND ANCILLARY WORKS. THE PERMISSION IS SOUGHT FOR A 10 YEAR PERIOD. AN EIS HAS BEEN SUBMITTED
INCREASE THE HEIGHTS OF 5 NO. WIND TUBINES (INCREASE THE HEIGHT FROM THAT PREVIOUSLY GRANTED PERMISSION BY KERRY COUNTY COUNCIL IN PLANNING REG. NO. 08/2030. ALL OTHER DETAILS AND LAYOUT REMAIN AS PER PLANNING REG NO. 08/2030)
CONSTRUCT AN EXTENSION TO A PERMITTED TWELVE TURBINE WIND FARM DEVELOPMENT (PLANNING REF 13/114). THE DEVELOPMENT WILL CONSIST OF SIX WIND TURBINES (HUB HEIGHT UP TO 85M AND MAXIMUM BLADE TIP HEIGHT OF UP TO 126.5 M), UPGRADING OF EXISTING ACCESS ROADS, CONSTRUCTION OF ADDITIONAL ACCESS ROADS, FURTHER DEVELOPMENT OF TWO EXISTING BORROW PITS ON THE SITE AND ASSOCIATED ANCILLARY WORKS. DEVELOPMENT PREVIOUSLY GRANTED UNDER KERRY COUNTY COUNCIL PLANNING REF 13/114 WILL FACILITATE THE PROPOSED EXTENSION TO THE WIND FARM. PLANNING PERMISSION IS BEING SOUGHT FOR A TEN YEAR PERIOD. AN ENVIRONMENTAL IMPACT STATEMENT (EIS) AND NATURA IMPACT STATEMENT (NIS) ACCOMPANY THE APPLICATION
DEVELOPMENT OF A REVISED SUBSTATION LAYOUT, PREVIOUSLY GRANTED (PDA 13/114). THE DEVELOPMENT WILL CONSIST OF A SUBSTATION COMPOUND (AREA = 747.82M2) WITH A SINGLE STOREY SUBSTATION BUILDING (AREA = 88.2M2) AND ASSOCIATED UNDERGROUND SERVICES. THE SUBSTATION COMPOUND AND BUILDING WILL BE ENCLOSED BY A 2.4 METRE HIGH PALISADE STEEL FENCE.
No Environment Impact Assesments Associated with this Application