Planning Application: 04510130 (Louth County Council )
File Number:
04510130
Application Type:
RETENTION
Planning Status:
APPLICATION FINALISED
Received Date:
18/05/2004
Decision Due Date:
24/08/2004
Validated Date:
18/05/2004
Invalidated Date:
Further Info Requested:
06/07/2004
Further Info Received:
28/07/2004
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
23/08/2004
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Jimmy Carter
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
Retain & complete an extension to O'Caseys licenced premises at 78 Trinity St. A listed building P2/97. Extension is at 79 Trinity St & consists of lounge extension with toilets & kitchen area into No.79 on gnd.floor & pool room into No.79 on 1st floor.
Retain & complete an extension to O'Caseys licenced premises at 78 Trinity St. A listed building P2/97. Extension is at 79 Trinity St & consists of lounge extension with toilets & kitchen area into No.79 on gnd.floor & pool room into No.79 on 1st floor.
78-79 Trinity Street (O'Casey's Bar) Drogheda Co Louth
Permission for the change of use from a Public House to shared accommodation and all associated site works. No. 78 is listed as a Protected Structure (DB-227)
Permission for the following:
1. Change of use from public house to residential consisting of 5no. residential units.
2. Subdivision of existing building to 3no. 2-bedroom residential units with provision of private amenity space for each unit
3. Partial demolition of existing bar and toilets to the rear of existing building
4. Demolition of existing storage & refrigeration building to the rear of the existing building.
5. Construction of new 3-storey building to the rear of the site to provide 1no. 2-bedroom residential unit to the ground floor and 1no. 3-bedroom duplex unit to the 1st & 2nd floors with provision of private amenity space for each unit.
6. New boundary treatment along existing lane with new pedestrian access gates.
7. Provision of bicycle parking, bin store and communal garden
8. All associated site development and infrastructure works**Significant further information received on 5.9.23**
No Environment Impact Assesments Associated with this Application