Planning Application: 201176 (Louth County Council )
File Number:
201176
Application Type:
PERMISSION
Planning Status:
INCOMPLETED APPLICATION
Received Date:
23/12/2020
Decision Due Date:
Validated Date:
Invalidated Date:
23/12/2020
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Decision Date:
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
04/02/2021
Applicant Details
Applicant name:
Calbruno Ltd.
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
Permission for the change of use from a Public House to shared accommodation and all associated site works. No. 78 is listed as a Protected Structure (DB-227)
Development Address:
78-79 Trinity Street (O'Casey's Bar), Drogheda, Co Louth
Permission to demolish no. 79 Trinity Street, and construct an extension to O'Caseys Bar on the ground floor with a pool room on the first floor at O'Caseys Bar, Trinity Street, Drogheda
Retain & complete an extension to O'Caseys licenced premises at 78 Trinity St. A listed building P2/97. Extension is at 79 Trinity St & consists of lounge extension with toilets & kitchen area into No.79 on gnd.floor & pool room into No.79 on 1st floor.
Permission for the following:
1. Change of use from public house to residential consisting of 5no. residential units.
2. Subdivision of existing building to 3no. 2-bedroom residential units with provision of private amenity space for each unit
3. Partial demolition of existing bar and toilets to the rear of existing building
4. Demolition of existing storage & refrigeration building to the rear of the existing building.
5. Construction of new 3-storey building to the rear of the site to provide 1no. 2-bedroom residential unit to the ground floor and 1no. 3-bedroom duplex unit to the 1st & 2nd floors with provision of private amenity space for each unit.
6. New boundary treatment along existing lane with new pedestrian access gates.
7. Provision of bicycle parking, bin store and communal garden
8. All associated site development and infrastructure works**Significant further information received on 5.9.23**