Planning Application: 20696 (Louth County Council )
File Number:
20696
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
09/09/2020
Decision Due Date:
30/12/2020
Validated Date:
09/09/2020
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
22/11/2020
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
13/10/2020
Applicant Details
Applicant name:
PJ & EJ Doherty
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
SHD STAGE 3 - Application lodged with An Bord Pleanála (Stage 2 Ref. 20/69) for provision of a total of 257no. residential units along with
provision of a crèche. Particulars of the development comprise as follows:
(a) Site excavation works to facilitate the proposed development to include excavation and
general site preparation works along with removal of existing site compound.
(b) The provision of a total of 163no. residential dwellings which will consist of the following
unit mix
-57no. 2 bed dwellings (house types 1, 1a, 1b)
-76no. 3bed semi detached dwellings (house types 2, 2a, 2b, 3, 6)
-5no. 3 bed terrace dwellings (terrace block 3)
-13no.4 bed semi detached dwellings (house type 6a)
-12no. 4 bed detached dwellings (house types 4 & 5)
(c) The provision of a total of 94no. apartments/duplex units consisting of 19no. 1 bed
units, 38no. 2bed units and 37no. 3bed units;
(d) Provision of a creche;
(e) Provision of associated car parking at surface level via a combination of in-curtilage
parking for dwellings and via on-street parking for the creche, duplexes and
apartments;
(f) Provision of 4no. electric vehicle charge points adjacent to the creche building with
associated site infrastructure ducting to provide charge points for residents throughout
the site;
(g) Provision of associated bicycle storage spaces with associated enclosures both at
surface level throughout the site and bicycle storage facilities within apartment blocks
1 & 2;
(h) Use of existing access from Dublin Road with associated upgrade works to facilitate
vehicular, pedestrian and cycle access to include provision of a right turning lane;
(i) Provision of a cycle path along Dublin Road;
(j) Provision of internal access roads and footpaths and associated connections to the
existing Earlsfort residential estate;
(k) Provision of residential communal open space areas (including formal play areas)
including all hard and soft landscape works with public lighting, planting and boundary
treatments to include boundary walls, railings & fencing;
(l) Provision of 2no. ESB substations;
(m) Internal site works and attenuation systems to include a hydrocarbon and silt
interceptor on the storm network prior to discharge to the adjacent watercourse;
(n) All ancillary site development/construction works to facilitate foul, water and service
networks for connection to the existing foul, water, gas and ESB networks. Number of units reduced to 216 by An Bord Pleanala
Development Address:
Dublin Road, Haggardstown, Dundalk, Co Louth
Architect Name:
Location Key:
HAGGARDSTOWN BLACKROCK
Electoral Division:
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
22/11/2020
Manager Order:
308135-20
Decision Type:
Conditional
Number of Conditions:
27
Grant Date:
23/12/2020
Grant Managers Order #:
308135-20
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
22/12/2025
Decision Description:
SHD STAGE 3 - Application lodged with An Bord Pleanála (Stage 2 Ref. 20/69) for provision of a total of 257no. residential units along with
provision of a crèche. Particulars of the development comprise as follows:
(a) Site excavation works to facilitate the proposed development to include excavation and
general site preparation works along with removal of existing site compound.
(b) The provision of a total of 163no. residential dwellings which will consist of the following
unit mix
-57no. 2 bed dwellings (house types 1, 1a, 1b)
-76no. 3bed semi detached dwellings (house types 2, 2a, 2b, 3, 6)
-5no. 3 bed terrace dwellings (terrace block 3)
-13no.4 bed semi detached dwellings (house type 6a)
-12no. 4 bed detached dwellings (house types 4 & 5)
(c) The provision of a total of 94no. apartments/duplex units consisting of 19no. 1 bed
units, 38no. 2bed units and 37no. 3bed units;
(d) Provision of a creche;
(e) Provision of associated car parking at surface level via a combination of in-curtilage
parking for dwellings and via on-street parking for the creche, duplexes and
apartments;
(f) Provision of 4no. electric vehicle charge points adjacent to the creche building with
associated site infrastructure ducting to provide charge points for residents throughout
the site;
(g) Provision of associated bicycle storage spaces with associated enclosures both at
surface level throughout the site and bicycle storage facilities within apartment blocks
1 & 2;
(h) Use of existing access from Dublin Road with associated upgrade works to facilitate
vehicular, pedestrian and cycle access to include provision of a right turning lane;
(i) Provision of a cycle path along Dublin Road;
(j) Provision of internal access roads and footpaths and associated connections to the
existing Earlsfort residential estate;
(k) Provision of residential communal open space areas (including formal play areas)
including all hard and soft landscape works with public lighting, planting and boundary
treatments to include boundary walls, railings & fencing;
(l) Provision of 2no. ESB substations;
(m) Internal site works and attenuation systems to include a hydrocarbon and silt
interceptor on the storm network prior to discharge to the adjacent watercourse;
(n) All ancillary site development/construction works to facilitate foul, water and service
networks for connection to the existing foul, water, gas and ESB networks
Extension of duration of the appropriate period of the ABP permission reference 308135-20 which comprises the provision of a total of 216 no.residential units along with provision of a creche and all ancillary site development/construction works.